Skip to main content
. 2025 Dec 17;7(1):3. doi: 10.1007/s42979-025-04533-w

Table 6.

Summary of simulation results

Metric Ruleset 1 (transparent) Ruleset 2 (blind)
Control Group I Group II Control Group I Group II
allow/join* 49.36% 49.76% 63.07% 49.93% 50.39% 64.91%
allow/wait 1.96% 1.57% 1.62% 2.37% 1.91% 1.92%
block/join 1.15% 0.67% 0.00% 2.20% 1.82% 0.00%
block/wait 47.52% 48.00% 35.30% 45.50% 45.89% 33.17%
Near misses 0.44% 0.14% 0.08% 0.63% 0.43% 0.19%
Crashes 0.00% 0.00% 0.00% 0.07% 0.04% 0.01%
Average payoff (vehicle Inline graphic) − 0.751 − 0.724 − 0.758 − 1.059 − 0.952 − 0.809
One-tailed paired t-test (vs Control) < 0.01 < 0.01 < 0.01 < 0.01
One-tailed paired t-test (vs Group I) < 0.01 < 0.01
Average payoff (vehicle Inline graphic) − 0.511 − 0.492 − 0.403 − 0.761 − 0.654 − 0.435
One-tailed paired t-test (vs Control) < 0.01 < 0.01 < 0.01 < 0.01
One-tailed paired t-test (vs Group I) < 0.01 < 0.01

*For test/group II, allow/join also includes forced joins, regardless of vehicle Inline graphic's Inline graphic