Skip to main content
. 2026 Jan 19;16:2437. doi: 10.1038/s41598-025-31640-8

Table 2.

Band rationing equations for (Spectral indices ) thematic Layers.

Thematic map Band combination Landsat 8 OLI bands Equation References
NDVI NDVI = (NIR - R) / (NIR + R) NDVI = (Band 5 – Band 4) / (Band 5 + Band 4). (1) 33,34
SAVI SAVI= ((NIR - R) / (NIR + R + L)) * (1 + L) SAVI = ((Band 5 – Band 4) / (Band 5 + Band 4 + 0.5)) * (1.5). (2) 35
NDWI NDWI = (NIR – SWIR) / (NIR + SWIR) NDWI = (Band 5 – Band 6) / (Band 5 + Band 6) (3) 36,37
TGSI TGSI= (Red-Blue)/(Red + Blue + green) TGSI = (Band 4 – Band 2) / (Band 4 + Band 2 + Band 3) (4) 38,39