Table 3.
Post-operative complications between HCCA patients with PVR and non-PVR.
| Variables | Total | Non-PVR | PVR | P |
|---|---|---|---|---|
| (n = 317) | (n = 255) | (n = 62) | ||
| Clavien–Dindo grade ≥ III | 40 (14.83) | 29 (11.37) | 11 (17.74) | 0.176 |
| Fever, n (%) | 122 (38.98) | 89 (35.32) | 33 (54.10) | 0.002 |
| Bile leakage, n (%) | 58 (18.30) | 34 (13.33) | 24 (38.71) | 0.001 |
| Infection, n (%) | 180 (57.51) | 135 (53.57) | 45 (73.77) | 0.004 |
| Cholangitis, n (%) | 17 (5.45) | 12 (4.78) | 5 (8.20) | 0.459 |
| Bowel leakage, n (%) | 4 (1.28) | 4 (1.59) | 0 (0.00) | 1 |
| Hydrothorax diameter > 3 cm, n (%) | 63 (21.28) | 49 (20.76) | 14 (23.33) | 0.664 |
| Abdominal puncture drainage, n (%) | 50 (16.03) | 41 (16.33) | 9 (14.75) | 0.763 |
| Post-operative hemorrhage, n (%) | 115 (38.33) | 89 (37.08) | 26 (43.33) | 0.373 |
| Post-hepatectomy liver failure, n (%) | 14 (4.42) | 8 (3.14) | 6 (9.68) | 0.025 |
| Hospital stays (days) | 24.40 ± 13.23 | 23.94 ± 13.39 | 26.28 ± 12.50 | 0.217 |
| 90-day mortality, n (%) | 26 (8.20) | 19 (7.45) | 7 (11.29) | 0.323 |
| Readmission within 90 days, n (%) | 45 (14.20) | 30 (11.76) | 15 (24.19) | 0.012 |
HCCA, hilar cholangiocarcinoma; PVR, portal vein reconstruction.