Table 8.

Predicted process times for gripper assembly and full tumbler assembly. Times shown are mean±standard deviation. Further information on the slithering robot can be found in Section 6

Predicted process time (s)
Gripper assembly 273.38±68.86
Tumbler embedding, loading, and sealing 352.14±48.42
Slithering robot assembly 501.08±129.29