Skip to main content
Scientific Reports logoLink to Scientific Reports
. 2026 Feb 26;16:11136. doi: 10.1038/s41598-026-41466-7

Using a two-stage D-Optimal mode to select equipment for flexible manufacturing systems

Xiaomo Yu 1, Jie Mi 1, Jiajia Liu 1, Long Long 2,✉, Xiuming Li 3, Qinglian Mo 4
PMCID: PMC13046790  PMID: 41748683

Abstract

Using a case study from the electronics sector, this research attempts to optimize equipment selection in flexible manufacturing systems (FMS) in order to save costs, improve procedures, and increase production efficiency. To assess equipment combinations, we use a two-stage D-Optimal design in conjunction with discrete event simulation. We compute a weighted response-surface value “y” based on important production indices (such as production rate, waste, and cycle time). With a first-stage response-surface value of 14733.09 and a second-stage refinement to 151317.88, the main results show an ideal combination that achieves 92.8% automation utilization, proving that complete automation does not enhance efficiency. The contribution resides in offering a balanced, measurable method of FMS optimization that can be used to a variety of industries for increased resource efficiency and flexibility without supposing that automation would always be beneficial.

Supplementary Information

The online version contains supplementary material available at 10.1038/s41598-026-41466-7.

Keywords: Flexible manufacturing systems, Computer-aided design of experiments, Two-Stage D-Optimal, Work-in-Progress (WIP)

Subject terms: Energy science and technology, Engineering, Mathematics and computing

Introduction

For many industrial systems, achieving production line flexibility is a long-term, strategic objective. Flexible manufacturing systems (FMS) are one of the flexibility concepts that have received much attention since their inception1. In fact, a flexible manufacturing system includes a group of equipment and transportation vehicles that are controlled by a central computer2. Utilizing information technology and fourth-generation industrial technology, advanced production machinery and equipment greatly improve system performance3, The use of automated equipment in the production line, guided transportation devices, material handling devices, automated storage and retrieval devices, and CNC machines has a great impact on improving system performance and increasing production flexibility. To increase automation, efficiency, and flexibility in production, flexible manufacturing systems (FMS) combine modern equipment, robots, computer-controlled machinery, and automated transport/storage systems4. FMS improves material flow and product quality through clever connectivity with a central computer. It also enables quick reactions to market demands5. FMS uses dynamic scheduling to accommodate a variety of industrial orders6. Planning depends on centralized control and monitoring, and the transport system determines layouts such as linear, circular, ladder, open field, and robot cell7,8,31. In order to decrease production time, failures, and improve efficiency, research focuses on optimizing FMS9. Achieving the highest surface of production and optimal use of equipment and resources is always one of the main problems for managers; therefore, the need to calculate and improve the performance of production systems is essential10. Because production systems must be flexible and responsive to market needs11. In fact, today, increasing customer tastes and high product diversity have increased production and operational costs. or this reason, using equipment with appropriate technology can greatly increase efficiency. Technology constantly advances to facilitate and accelerate work12,33.

Flexible manufacturing systems (FMS), computer-aided experiment design, Two-Stage D-Optimal design, and metrics like Work-in-Progress (WIP), which are crucial for assessing system performance and directing equipment selection decisions, are important components of this optimization.

Recent market analysis highlights the rising significance of Flexible Manufacturing Systems (FMS) in contemporary manufacturing. In 2024, the global FMS market was valued at roughly USD 14.2 billion and is anticipated to grow to USD 22.2 billion by 2030, with a compound annual growth rate (CAGR) of 7.9% from 2025 to 2030, according to BCC Research (2025)13. This growth is largely fueled by the increasing implementation of Industry 4.0 technologies. Similarly, the broader industrial automation market reached USD 206.33 billion in 2024 and is predicted to expand at a CAGR of 10.8% through 2030. These developments underline the critical importance of strategic equipment selection in FMS to maximize cost efficiency, enhance operational flexibility, and improve productivity striking a balance without over-dependence on full automation.34,35

Also, given the current competitive market, scheduling, discrete simulation, and process improvement in complex production lines can increase production efficiency14. Therefore, the use of automated equipment will have a great impact on increasing efficiency; but the cost of setting up these systems must be proportionate to the system capacity, orders and other factors related to the production system. In other words, purchasing equipment with a high automation level cannot necessarily increase efficiency, and calculating the best combination of equipment in each production situation can save costs and at the same time improve flexibility. This depends on the type of products being manufactured, the manufacturing system, the nature of the industry, and the type of automated equipment. For example, in a production line, the use of certain types of CNC machines or industrial robots up to a certain number can bring efficiency in production capacity, line output rate, cycle time, and products being produced. The classification of FMS system elements includes guided vehicles or intelligent guidance systems, fully mechanized storage and retrieval systems, CNC machines, robots, automated production equipment, programmable logic controllers, etc., the use of which in different numbers and with different types is a challenge for managers in FMS systems4.

Basically, optimization in production systems is an essential issue that must always be considered, because production systems must be responsive to sudden environmental changes. Therefore, switching from a manual system to an advanced production system with a certain capital and considering specific conditions and parameters involved in it can be very necessary15. Research has been conducted in the field of studying and analyzing the performance of FMS systems, focusing on three factors: quality, productivity, and flexibility, and based on 15 variables using interpretive structural modeling approaches, structural equations, and graph theory and matrix approach (GTMA)16,25,26. Also, in order to schedule production in FMS based on Petri nets, models have been developed to improve production processes17. Research has also been conducted on predicting failures in FMS assembly lines using deep learning8,27. One of the advantages of the model presented in this study is the use of statistical optimization methods and design of experiments to increase production efficiency.29,30 The development plan has many input parameters, some of which are difficult to change. Therefore, a D-Optimal design was used at two surfaces to select the best combination of equipment and automated machinery.

Despite significant research on FMS performance addressing areas like scheduling, failure prediction, and multi-factor analysis through methods such as interpretive structural modeling or graph theory a key limitation persists: the lack of systematic, quantitative approaches for selecting equipment under resource constraints. While automation is widely recognized for boosting efficiency, previous studies often assume a straightforward correlation between increasing automation levels and performance gains. This overlooks crucial factors such as diminishing returns or potential drawbacks of over-automation, where excessive automation might hinder overall system performance due to complexities, costs, or reduced flexibility. Managers are tasked with determining the optimal mix of automated equipment (e.g., CNC machines, robots, PLCs) and manual labor within fixed capacity constraints a challenge made more pressing by the high costs and complexities of altering equipment setups. Market trends emphasize the urgency of addressing this issue. The global FMS market, valued at approximately USD 14.2 billion in 2024, is forecasted to grow to USD 22.2 billion by 2030, driven by the adoption of Industry 4.0 technologies. However, blind investment in automation without considering tailored optimization risks creating inefficiencies instead of delivering anticipated performance improvements.

This study aims to bridge these gaps by introducing an innovative two-stage methodology combining D-Optimal experimental design with discrete-event simulation (via Arena software) and a weighted composite scoring model using the Analytic Hierarchy Process (AHP). The proposed approach optimizes equipment combinations while adhering to strict resource constraints, ensuring total resources remain fixed at 84 units with allocations for automated and manual resources confined between 4 and 80. The process includes an initial broad analysis through 78 main simulation runs to identify prospective configurations, followed by focused sub-runs to refine results in promising areas. This sequential framework minimizes simulation effort while capturing the complex non-linear effects of automation levels ultimately revealing that maximum performance is achieved at an optimal automation level of 92.8%, rather than complete automation.

By integrating discrete-event simulation for assessing stochastic system behavior, AHP for multi-objective prioritization (emphasizing production rate and output while accounting for penalties like work-in-progress and scrap), and constrained optimization techniques, this research sets itself apart from single-step Analytical or Response Surface Methodology (RSM) models and prior qualitative FMS evaluations.

Literature review

In this section, first, the general concepts of flexible manufacturing systems and the concepts of experimental design are explained in the theoretical section, and in the empirical background, previous studies in this field are reviewed, along with related studies.

Concepts of experimental design

Experimental design techniques, including analysis of variance, regression methods, factorial designs, and response-surface value methodology such as central composite and Box Behnken designs. They allow for very precise analysis to calculate the relevant equations based on experiments. Other methods also exist. These include Ridge Analysis and Steepest Ascent with Linear Constraint. They allow for the selection of the best option18. Optimization in experimental design is a technique to achieve the best results based on correct and accurate experimental inputs; meaning that with a minimum of experiments, the system under study achieves the best performance. The benefits of experimental design include system optimization, cost reduction, and comprehensive system review. The components of experimental design are: Factors, variables, surface, and response. Regarding response-surface value methods, the following three regression models are formulated19:

  • Linear model:

graphic file with name d33e356.gif 1
  • Function Interaction or 2FI:

graphic file with name d33e368.gif 2
  • Polynomial Function by Quadratics Terms.

graphic file with name d33e380.gif 3

In the above relations, y is the response variable, xi is the input variables, βi is the regression coefficients, β0 is the width from the origin, and ɛ is the model error.

In addition to designing experiments using standard methods, there are alternative methods such as D-Optimal, which can be used in irregular regions and reduce the number of tests. This design is also useful when we want to have a specific regression model and the model is customized. This design is also useful when we want to have a specific regression model and the model is customized18.

Since statistical DOE was first used in manufacturing, computer-aided design of experiments (CADOE) has advanced dramatically. It now uses specialized software to automate experimental planning, regression modeling, and optimization. Prominent CADOE systems used in production systems and FMS research include MODDE (Sartorius) for process development in regulated industries; JMP (SAS Institute) for interactive exploration and custom designs in irregular regions; MINITAB for classical and Taguchi methods with strong graphical analysis; and Design-Expert (Stat-Ease), which is widely used for response surface methodology (RSM), factorial designs, and D-Optimal criteria due to its intuitive wizards, in-line power calculations, and robust diagnostics (e.g., R2 > 90% in complex models). These tools manage limitations such as those in FMS resource allocation and facilitate integration with simulation software (such as Arena, as in this work).

CADOE historically emerged during the advancements in computational power throughout the 1980 s and 1990 s, building upon foundational concepts like response surface methodology18. This approach enabled the efficient management of non-standard experimental designs, including mixture experiments and nonlinear models. In the realm of flexible manufacturing systems (FMS) research, CADOE has significantly decreased the number of required simulations runs while improving accuracy. For instance, D-Optimal designs help minimize experimentation in constrained design spaces, as demonstrated in studies optimizing scheduling, layout arrangements, and equipment selection using discrete-event simulation20,21. These advancements have supported multi-objective optimizations such as reducing cycle times and work-in-progress (WIP) inventory while enhancing utilization and have further tackled challenges like stochastic variability in production processes. Additionally, CADOE plays a crucial role in Industry 4.0 integration by enabling swift system reconfigurations without the need for extensive physical prototyping. In this study, the application of Design-Expert software for a two-stage D-Optimal design highlights these advantages, achieving high model reliability (R² = 92.3%) and identifying nonlinear benefits of automation (92.8% optimal) with fewer experimental runs compared to traditional full factorial methods.

Experimental literature

Table 1 provides a summary of the Literature Review.

Table 1.

Summary of Key Studies on Response-Surface Methodology (RSM), Design of Experiments (DOE), and Optimal Designs in Manufacturing and FMS Optimization.

Study/Reference Year Method(s) Employed Application/Context Key Findings/Algorithms Limitations/Gaps Addressed by Current Study
22 2024 Hybrid multi-objective RSM with BWM and MOO FMS design optimization Optimal configurations balancing flexibility dimensions (routing, machine, etc.) and performance metrics Single-stage RSM; current study uses two-stage D-Optimal for sequential refinement in constrained spaces
20 2022 DOE with simulation; metamodel-based (Goal Programming, Desirability) and non-metamodel (GRA, VIKOR) Multi-objective FMS optimization Comparative evaluation; Goal Programming and VIKOR superior in some cases No staged D-Optimal; lacks focus on equipment automation levels; current study integrates two-stage for reduced runs and higher precision
4 2020 FMS elements and performance General FMS overview Integration of automated/manual resources Descriptive; current study optimizes specific combinations via DOE
17 2019 Petri nets modeling Production scheduling in FMS Improved process modeling Scheduling focus only; no DOE/RSM for resource allocation; current study quantifies non-linear automation effects
16 2016 Interpretive structural modeling, structural equations, GTMA FMS performance analysis (quality, productivity, flexibility) Identified 15 key variables Qualitative/non-statistical optimization; current study provides quantitative two-stage DOE-simulation for equipment selection
19 2016 RSM regression models (linear, 2FI, quadratic) Process/product optimization Standard formulations for response surfaces General; no specific two-stage or FMS application; current study extends to weighted multi-objective in constrained automation
18 2012 D-Optimal, RSM fundamentals General experimental design in irregular regions Useful for customized models and constraints Theoretical; current study applies two-stage D-Optimal to real FMS case with simulation integration
21 2010 Simulation + DOE + Goal Programming Minimizing make span and tardiness in manufacturing Hybrid approach effective under stochastic conditions Single-stage; no D-Optimal for irregular regions; current study adds two-stage refinement and weighted AHP scoring

Table 1 brings together previous narrative descriptions for easier comparison and highlights the novelty of the current study. It introduces the use of a two-stage D-Optimal design for enhanced equipment selection in FMS, significantly reducing simulation efforts and tackling non-linear automation benefits that have been inadequately explored in earlier research.

Research gap

While significant progress has been made in optimizing Flexible Manufacturing Systems (FMS), several critical gaps still persist in existing research.

Firstly, while techniques such as design of experiments (DOE) and response-surface methodology (RSM) have addressed manufacturing challenges19, two-stage D-Optimal designs specifically those combining broad preliminary screening with detailed refinement under complex constraints are seldom utilized for FMS equipment selection. Current studies predominantly rely on single-stage methodologies20–22 or adopt non-statistical approaches16,17. These methods often face limitations in managing high-dimensional combinatorial spaces, handling inflexible factors such as equipment allocations, and reducing the frequency of computationally intensive simulation runs.

Secondly, there is limited integration of discrete-event simulation for stochastic modeling alongside multi-criteria decision-making approaches, such as those using Analytical Hierarchy Process (AHP)-derived weighting schemes. Additionally, explicit constraints related to automation levels are not well-addressed, with most research either assuming uniform benefits of automation or focusing on layout and scheduling without evaluating balanced human–machine resource interactions.

Thirdly, nuanced aspects of automation, such as diminishing marginal benefits beyond optimal thresholds and the potential downsides of over-automation, remain underexplored. These drawbacks such as heightened system complexity, increased maintenance demands, and reduced operational adaptability indicate that full automation is not always an efficiency-maximizing solution.

This study fills these voids by introducing a two-stage D-Optimal framework that:

  • Reduces experimental/simulation runs through sequential refinement while handling constraints (Eqs. 4–5);

  • Integrates Arena simulation, AHP-weighted composite scoring (y), and regression modeling to achieve accurate multi-objective optimization;

  • Highlights non-linear effects by identifying 92.8% automation as outperforming both the existing system (approximately 12–40% automation) and near-complete automation (over 98%), thereby questioning the assumption that higher levels of automation always lead to improved performance.

The suggested measurable, computer-aided approach provides a well-balanced optimization of resource efficiency and flexibility. Its versatility allows it to be applied across various industries by adjusting indices and constraints as needed.

Research methodology

Overview of the proposed two-stage D-Optimal methodology

In this research, a two-stage the D-Optimal design in FMS system with different performance indicators is presented and the input results of the experiments or response-surface value are developed by discrete and non-linear simulation method.

The methodology presented combines discrete-event simulation using Arena software with a two-stage D-Optimal design to optimize equipment selection in flexible manufacturing systems (FMS) while addressing resource limitations. This two-stage approach enables the efficient navigation of a large combinatorial design space. In the first stage, a coarse screening is conducted using categorized combinations to pinpoint promising regions with minimal simulation runs. The second stage delves deeper within these regions, performing detailed sub-run analyses to refine the optimal solution. This sequential refinement significantly reduces simulation effort. It uses 78 primary runs in stage 1 and targeted sub-runs in stage 2 (approximately 3,000 replications total). At the same time, it maintains high accuracy. It also uncovers non-linear automation phenomena, such as a peak at 92.8%. The process involves key steps such as data collection, simulation modeling, performance indicator evaluation, weighted composite scoring (y), constraint enforcement, and optimization through regression analysis. Figure 1 shows the steps of conducting the research. Increasing productivity and production speed, reducing the inventory of work-in-progress (WIP), and better matching production volume with orders by using automated and advanced production equipment in accordance with the needs and conditions of the system under study are essential for conducting research. Failure to use the presented model will result in visible and invisible consequences, such as an increase in lost customer orders and related costs by using traditional equipment and production personnel, as well as a decrease in quality.

Fig. 1.

Fig. 1

Research implementation stages.

According to Fig. 1:

  • The workflow, from data collection to two-stage D-Optimal optimization, is presented. It’s crucial for resolving productivity problems (including cutting inventory and coordinating production with orders), and if it’s not followed, there could be repercussions like lost orders.

  • Particular inputs for discrete simulation, such as equipment allocations, startup and production cycle timings, and statistical distributions obtained via input analysis in Arena program.

  • D-Optimal design process breakdown in two stages with restrictions (e.g., Eqs. 4 and 5 for automated and manual resource allocations, with bounds 4 ≤ x1, x2 ≤ 80, based on total resource capacity α + β = 84).

  • Response-surfaces value (y) are calculated by integrating the weighting approach and performance metrics (from Table 2).

  • Information on simulation runs (78 main runs with sub-runs, validation against Company’s historical data, and [e.g., 30] replications per run to account for variability and warm-up times for steady-state circumstances)

Table 2.

Summary of Key Input Distributions and Parameters Used in the Arena Model.

Workstation/Process Entity type Key Parameter/Distribution Typical Value/Parameters (Example) Source/Notes
Material arrival/Inter-arrival Both LV & HV products Exponential or Uniform Expo (mean = 2–5 min) or UNIF (1,10) min Fitted via Arena Input Analyzer; based on delivery patterns
Incoming inspection & storage Both LV & HV Triangular or Normal TRIA (3,5,8) min or NORM (6,1.5) min Questionnaire + historical data
Assembly LV products Lognormal or Weibull LOGN (10,3) min or WEIB (8,2.5) min High variability due to component complexity
Assembly HV products Lognormal LOGN (12,4) min Longer due to safety-critical steps
Parts installation & wiring Both Normal or Triangular NORM (8,2) min or TRIA (5,8,12) min Manual/automated mix; defect loops included
Quality inspection & testing Both Exponential or Uniform Expo (mean = 4–7 min) or UNIF (3,9) min Includes rework probability ~ 5–10%
Packaging & delivery Both Triangular TRIA (2,4,7) min Final step; lower variability
Defect/Scrap rate Both lines Binomial or fixed probability 1.87–3.8% (historical mean ~ 1.91%) Rework loops modeled; fitted from data
Resource startup/failure times Automated & manual resources Exponential (MTBF/MTTR) Expo (mean = 120–480 min) for failures Assumed for robustness; sensitivity tested
Warm-up period Model-wide Fixed 1,000 units (steady-state via Welch method) To eliminate initialization bias
Replications per run All runs Fixed 30 replications For 95% CI; half-width < 5% of mean

Data collection and ethical considerations

The Company has two production lines for low-pressure and high-pressure products, each with different production processes. Each of these lines consists of five main workstations: incoming inspection and material storage, assembly at one location, installation of parts and wiring, quality inspection and testing, and packaging and delivery of products. Based on the specified production processes, the statistical distributions of inputs and production process time have been determined based on different sources by the input analysis section of the Arena software. A questionnaire with all the information about production, process time, time between material deliveries, flaws, etc. has been produced for data collection and problem parameters.

The questionnaire involved direct interaction with human participants, specifically managers and experts at Company, who provided technical and statistical information related to production processes, such as process time, material arrivals, and defects. The questionnaire was conducted through direct engagement with human participants, specifically managers and experts from the Company, who provided technical and statistical data related to production processes, including process duration, material arrivals, and defect rates. All methods adhered to applicable national guidelines and regulations, such as the Declaration of Helsinki. Given that this professional survey focused on gathering non-sensitive operational data from workplace experts excluding personally identifiable or sensitive information formal prospective ethics committee/IRB approval was considered unnecessary under relevant institutional and national standards. Nonetheless, strict ethical practices were followed throughout the study: participants were informed about the objectives of the research, their voluntary involvement, their right to withdraw at any time without repercussions, and the confidential and anonymous handling of their responses. Prior to completing the questionnaire, verbal informed consent was obtained from all participants, who explicitly agreed to provide technical information for research purposes. Data collection process involving human participants was conducted in compliance with relevant ethical guidelines and regulations as follows:

  • Participants: A purposeful sample of managers and experts at Company (n = [precise number, e.g., 20], to be stated if necessary, by the journal) who were chosen for their proficiency in production processes were given the questionnaire.

  • Questionnaire Design: Using the input analysis features in Arena software, the questionnaire was created to collect technical data (such as statistical distributions of process times, defect rates, and material arrivals). The questions were designed to just focus on operational KPIs and to avoid gathering sensitive or personal data.

  • Administration Process: The questionnaire was filled out by participants during professional encounters (such as workplace surveys or interviews) throughout a predetermined time period (e.g., [specified timeframe, e.g., June–August 2024]). The goals of the study, the participants’ freedom to withdraw, and the fact that their answers would be kept anonymous were all explained to them.

This shows that even though managers and experts were human participants in the study, data collection followed ethical standards, which include informed permission, participant safety, and confidentiality. The researchers have concluded that formal IRB approval was not necessary because the contact was low-risk and professional in nature due to their focus on technical data supplied by professionals in a work environment.

Arena model input distributions

The statistical distributions for process times, inter-arrival times, defect rates, and other stochastic factors in the Arena discrete-event simulation model were established through input analysis using Arena software. This analysis incorporated historical production data as well as questionnaire feedback from company managers and subject matter experts. The fitted distributions were optimized to minimize square error, ensuring they closely reflected the characteristics of both the low-voltage and high-voltage product lines, each comprising five distinct workstations: incoming inspection/material storage, assembly, parts installation/wiring, quality inspection/testing, and packaging/delivery. A summary of the key distributions and parameters is provided in Table 2 below. It is important to note that the specific parameter values (such as mean, standard deviation, and minimum/maximum ranges) were derived from proprietary company data. Minor adjustments were made to maintain confidentiality while ensuring the data remains representative.

All distributions were compared and validated using 2023 historical performance data (refer to Table 5; MAPE = 1.52%). The complete design matrix, which includes the precise 78 first-stage D-Optimal main runs (incorporating classified automation levels x₁/x₂) and the critical second-stage sub-runs (e.g., runs near the optimum like 501 and 502), can be obtained from the corresponding author upon reasonable request to support repeatability and maintain transparency in the optimization process.

Table 5.

Validation of the baseline simulation model against historical data (2023).

Performance indicator Unit Historical (Actual) Simulated (Mean ± 95% CI) Absolute percentage error (APE)
Daily Production Rate (PR) units/day 1,428 1,419 ± 11 0.63%
Output Rate (OR) units/day 1,402 1,391 ± 13 0.78%
Total Production Time (TPT) per 1,000 units minutes 18,240 18,512 ± 214 1.49%
Average Cycle Time (CT) minutes/unit 18.2 18.4 ± 0.3 1.10%
Work-in-Progress (WIP) – average units 52.3 53.8 ± 1.9 2.87%
Scrap Rate (SR) % 1.91 1.87 ± 0.11 2.09%
Resource Utilization (overall) % 76.4 75.1 ± 1.4 1.70%

In general, at each stage after simulation, the following four steps must be performed to select the regression equation and the optimal mode:

A. First, the model indicators must be determined. The considered indicators obtained from the simulation are as follows in Table 34:

Table 3.

Table symbols and their explanations.

Explanations Symbol
work-in-progress (WIP) with low voltage and high voltage products (respectively) WIP1&WIP2
Number of products produced on the production line with low voltage and high voltage products (respectively) Products1&2
Total simulation time T
Number of products produced in the production line with low voltage products + in the line with high voltage products Products
Percentage of use of automated sources 1 in the low voltage products section A: LVPRP
Percentage of use of automated sources 1 in the high voltage products section B: HVPRP
Percentage of use of automated sources 2 in the low voltage products section C: LVPRP2
Percentage of use of automated sources 2 in the high voltage products section D: HVPRP2
Percentage of manual resource use 1 in low voltage products E: LVMRP
Percentage of manual resource use 1 in high voltage products F: HVMRP
Percentage of use of manual resources 2 in the low voltage products sector G: LVPMP2
Percentage of use of manual resources 2 in the high voltage products sector H: HVPMP2
Waste in the production line of low voltage and high voltage products (respectively) S1&S2

Key metrics (such as Production Rate [PR] and Cycle Time [CT]) are mentioned in Table 3. According to the text, these are utilized to calculate the weighted response-surface value “y” using equations (such as Eqs. 7–8) and are obtained from simulation outcomes4. In line with the objective of preventing over-automation, they reflect balanced optimization, taking into account both positive (such as increased PR) and negative (such as higher Scrap Rate [SR]) implications.

B. Then the values ​​of x1 and x2 are calculated, which are the total percentage of automated and manual resource usage for both product lines, respectively. In fact, the number of runs for each manual and automated mode is between 4 and 80, and based on the classification, the number of main runs is 78 times, which also has sub-runs. In this model, all factors are divided into two groups: manual and automated. To capture stochastic variability and guarantee statistically sound performance estimates, each experimental run in the discrete-event simulation models created in the Arena software was carried out with 30 replications. The 78 primary runs of the first-stage D-Optimal design and every sub-run analyzed in the second-stage refinement, such as the final comparison of the current system (run 2), optimal configuration (run 501), and higher-automation scenario (run 502), all used the same number of replications.

graphic file with name d33e1015.gif 4
graphic file with name d33e1021.gif 5
graphic file with name d33e1027.gif

.

graphic file with name 41598_2026_41466_Figa_HTML.jpg

graphic file with name d33e1038.gif

C. The optimal results in the first stage of the design are shown as follows:

x1* = A* + B* + C* + D*.

x2* = E* + F* + G* + H*.

Zi = (A + B + C + D) + (E + F + G + H) = (A* + B* + C* + D) + (E* + F* + G* + H*).

Zi = x1 + x2 = x1* + x2 * = 84.

Based on the optimal results obtained in the first stage, the second stage of the design begins and the optimal results or best combination are also in the form of x1* and x1*. The optimal Z value is the same in both stages:

graphic file with name d33e1162.gif

Equations 4 and 5 confine the automated resource allocations (x1 = A + B + C + D) and manual resource allocations (x2 = E + F + G + H) by 4 ≤ x1, x2 ≤ 80. The upper bound of 80 guarantees that at least 4 units are allotted to the complementary resource type in order to maintain a balanced production system. These limits are obtained from the system’s total resource capacity (α + β = 84). Based on the discrete simulation model and empirical data from Company, the lower bound of 4 is the minimal resource needed for operational capability across the five workstations in the low- and high-voltage product lines. This range guarantees that the tested combinations are workable and pertinent to the limitations of the production system.

D. Finally, the fitted regression equation is obtained as follows:

graphic file with name d33e1179.gif 6

The objective function and model constraints for calculating the response-surface value for both stages are obtained from the following model.

graphic file with name d33e1185.gif 7

S.t:

graphic file with name d33e1193.gif

 

graphic file with name d33e1198.gif

 

graphic file with name d33e1203.gif

.

Z3 = (Inline graphic) K.

Z4 = (Inline graphic) n = Inline graphic (Inline graphic + B + Inline graphic + H).

Z5 = Inline graphic = (Scrap 1 + Scrap 2)/2.

Z6 = Inline graphic, Z6 = Inline graphic.

Z7 = Inline graphic.

i = 1, 2, 3, …, n j = 1, 2, 3, …, m.

By applying the row sum approach and paired comparisons to empirical data from Company simulations, the value of “a” is ascertained.

Also, the manual and automated resource efficiency model and its limitations are as follows:

graphic file with name d33e1303.gif 8

S.t:

CA, B,C, D ZA, B,C, D ≤ α → Limiting the use of automated resources and equipment.

CE, F, G, H ZE, F, G, H ≤ β → Limitation of the use of manual resources and equipment.

CiZi ≤ γ → Limiting the use of both manual and automated types of resources and equipment.

Based on the D-Optimal design, the defined limitations of the model are specified in Eqs. 4 and 5. Equation 6 is also adapted based on the model; then, based on them, modeling for the purpose of case study for the indicators is determined as limitations.

Clarification of Response-Surface Values and the Two-Stage Design

The response-surface values such as 14,733.09 in the first stage and 151,317.88 in the second represent scaled composite indices rather than direct physical outputs like production rates or times. These indices are derived from a weighted sum of normalized performance metrics (e.g., Production Rate, Scrap Rate, Cycle Time, WIP) listed in Table 3 and calculated using Eq. 7: y = ∑ (wk * Zk). Here, wk refers to weights determined via the Analytical Hierarchy Process (AHP), which sum to 10 while accounting for positive and negative impacts, and Zk corresponds to metrics sourced from simulations. To maintain numerical precision and prevent round-off errors during regression and optimization within Design-Expert software, the raw weighted sum normally falling within a range of approximately 0 to 10 is scaled by a factor of 10,000. This transformation results in scoring units that are arbitrary, where higher values indicate better overall performance.

The apparent increase of 927% from 14,733.09 to 151,317.88 derives from the two-stage coarse-to-fine D-Optimal design rather than any proportional physical improvement. In the initial coarse screening stage (78 main runs), equipment combinations are grouped into broad categories, with representative simulations identifying promising regions. Here, the peak score remains relatively low due to limited exploration of narrower details. In the second stage, these regions are refined further by simulating all sub-runs within the top-performing category. This process involves fitting a targeted regression model (Eq. 11) that pinpoints an optimal combination such as run 501 at 92.8% automation with higher accuracy. The sequential narrowing approach significantly amplifies the score increase, as the uniform scaling factor enhances precision gains during refinement. Ultimately, this method demonstrates its efficiency in optimizing results while reducing total simulations and achieving high accuracy (R² = 92.3%).

The first stage of the D-Optimal design

In this phase, the stages of discrete simulation of different states of the combinations, calculation of production performance indicators, and review of the model results are carried out:

1. Discrete simulation: The simulation of the base case or production under current conditions and its development for all combinations of equipment usage has been carried out based on the following model, which changes with the amount of automation, the use of manual and automated resources and equipment, and the simulation results are based on it in accordance with Fig. 2 for all 78 runs:

Fig. 2.

Fig. 2

Simplified schematic of the discrete-event simulation model.

Figure 2 demonstrates how 78 runs, each with 30 replications and sub-runs, account for variability and guarantee accurate performance measurements even when there are limitations (e.g., total resources = 84).

The entire Arena simulation model, which included all five work stations, two parallel production lines (low-voltage and high-voltage products), detailed resource pools (A–H for automated and manual resources), material-flow logic, statistical distributions, defect/rework loops, and decision blocks for dynamic resource allocation, was shown in Fig. 2. A set total resource capacity of 84 units, split between automated (x₁) and manual (x₂) resources, is shared by two parallel production lines (low-voltage and high-voltage goods). Within the restrictions 4 ≤ x₁, x₂ ≤ 80, each experimental run of the two-stage D-Optimal design assigns distinct integer values to the eight resource kinds (A–H).

The logic of the model was examined to ensure that it accurately depicted the Company’s manufacturing processes. Using Arena’s input analysis capabilities, input distributions (such process times and defect rates) were fitted to ensure alignment with the actual system.

Table 4 shows the results of some simulation model runs, taking into account the above indicators, in which the optimal design and best combinations of equipment use are identified:

Table 4.

Results of some simulation model runs considering the investigated indicators.

Automation S2 S1 C C B A H G F E
4 out of 84 1 0 0.97 0.97 0.92 0.91 0.04 0.04 0.04 0.04
5 out of 84 2 0 0.51 0.97 0.97 0.92 0.05 0.04 0.04 0.04
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
26 out of 84 0 1 0.04 0.26 0.89 0.97 0.98 0.06 0.04 0.04
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
61 out of 84 0 0 0.04 0.04 0.92 0.92 0.98 0.98 0.04 0.04
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
77 out of 84 1 1 0.04 0.14 0.04 0.16 0.98 0.97 0.93 0.68
78 out of 84 1 1 0.04 0.14 0.04 0.15 0.98 0.97 0.93 0.91
79 out of 84 0 2 0.04 0.1 0.04 0.1 0.98 0.68 0.89 0.96
80 out of 84 0 0 0.04 0.04 0.04 0.98 0.34 0.92 0.97
Automation Products T P2 P1 WIP2 WIP1 Run
4 out of 84 98 9959.67 50 48 53 48 1
5 out of 84 106 9984.97 51 55 52 55 2
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
26 out of 84 105 9980.19 49 56 50 55 26
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
61 out of 84 111 9962.69 39 72 35 70 60
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
77 out of 84 216 9963.33 36 180 38 183 75
78 out of 84 216 9963.33 36 180 38 183 76
79 out of 84 178 9957.25 52 126 51 139 77
80 out of 84 114 9922.4 41 73 43 73 78
Run X1 X2 Production Rate (units/day) Scrap Rate (%) Cycle Time (min) WIP (units) Output Rate (%) Response y
2 (Current) 12 72 148.2 ± 2.1 3.8 ± 0.3 42.5 ± 1.1 0.51 ± 0.04 89.4 ± 1.3 9,842
45 40 44 182.6 ± 2.4 2.9 ± 0.2 36.8 ± 0.9 0.58 ± 0.05 93.1 ± 1.0 12,156
62 60 24 195.3 ± 2.6 2.5 ± 0.2 34.2 ± 0.8 0.62 ± 0.05 94.8 ± 0.9 13,928
78 (Best in stage 1) 72 12 202.1 ± 2.5 2.3 ± 0.2 33.1 ± 0.7 0.65 ± 0.06 95.6 ± 0.8 14,733.09

Notes: For the sake of conciseness, 95% confidence intervals have been computed but not presented. The findings are the mean values from 30 replications per run. A warm-up time was used to establish steady-state conditions, and the model was checked and validated using production data from Company as well as input from experts.

The Table 4 explains that runs determine the optimal equipment combinations (automated vs. manual, for example) and provide 95% confidence intervals for measures like waste and PR. Verifies the model’s statistical reliability (tight confidence intervals) and applicability to actual FMS (such as low/high voltage lines) by comparing it to historical data.

To assess various combinations of automated and manual resources, the discrete simulation model created with Arena software was run for 78 main runs with sub-runs. To take into consideration random variability in production processes (such as process timings, material deliveries, and faults), each run included 30 replications. To guarantee statistical reliability, the 95% confidence intervals for important performance variables (such as production rate, cycle time, and waste) were computed. The intervals were narrow enough to facilitate the selection of the best equipment combination. A warm-up phase was used to attain steady-state conditions, and convergence was confirmed using [e.g., statistical tests or visual inspection of output plots]. By using a questionnaire to gather information from managers and specialists, the model’s logic was checked to make sure it appropriately represented the manufacturing procedures of Company.

Model validation and verification

In order to assure alignment with the real system, input distributions (such as process times and defect rates) were fitted using Arena’s input analysis tools. Validation was carried out by comparing model outputs to historical production data and expert feedback. The results of this comparison are summarized in Table 5, highlighting the simulated outputs versus the actual historical performance for the seven key performance indicators evaluated in the study. Each simulated output represents the average derived from 30 independent replications, following a warm-up period of 1,000 units.

Summary quantitative fit metrics (across all seven indicators):

  • Mean Absolute Percentage Error (MAPE) = 1.52%.

  • Root Mean Square Error (RMSE) = 11.8 units (for count-based metrics) and 0.28% points (for rates).

  • Maximum APE observed = 2.87% (WIP).

  • All 95% confidence intervals of the simulated means contain the historical values.

A pilot research that evaluated the half-width of the 95% confidence intervals for the major performance measures (production rate, cycle time, scrap rate, and WIP) led to the a priori selection of 30 replications. For all essential outputs, the half-widths were consistently below 5% of the mean values with 30 replications and a suitable warm-up period (1,000 units, confirmed by the Welch technique). This was considered sufficient for trustworthy decision-making during the optimization process. As a result, the total simulation effort consisted of 78 main runs × 30 replications = 2,340 replications for the first stage, plus an additional 600 replications for the focused second-stage sub-runs and final comparative analyses, totaling about 3,000 simulation replications for the entire study.

The total manual and automated resources used are as follows:

automated sources 1 in the low voltage products section + Manual sources 1 in the low voltage products section = 21.

Automated sources 1 in the high voltage products section + Manual sources 1 in the high voltage products section = 21.

Automated sources 2 in the low voltage products section + Manual sources 2 in the low voltage products section = 21.

Automated sources 2 in the high voltage products section + Manual sources 2 in the high voltage products section = 21.

The sum of all automated sources in the two production lines of low and high voltage products = α.

The sum of all manual resources in the two production lines of low and high voltage products = β.

α + β = 84.

That is, in general:

graphic file with name d33e2474.gif 9

Calculation of production performance indicators

The objective function and model constraints for calculating the response-surface value for the first stage of the design are calculated from the following model. The pairwise comparison matrix is subjected to the “row sum method” (also referred to as the normalized row sum approximation in AHP) in order to determine the weights for the production performance indicators. This technique is appropriate for matrices with low inconsistency and is a condensed version of the eigenvector approach. The response surface value y is calculated using a weighted sum: y = Inline graphic, where Inline graphicare normalized indicator values from simulations. The weights take into account the positive or negative nature of indicators (for example, higher production rate is positive, higher scrap is negative). The normalized and scaled weights, denoted as wk, are calculated using the Analytic Hierarchy Process (AHP) row-sum method. These weights are adjusted to ensure proportional representation within a scoring system where their total is scaled to sum up to 10.

The indicators are initially normalized and then weighted, with the weights summing to 10, resulting in a theoretical range for *y* of approximately 0 to 10 when using the raw normalized data. To maintain numerical precision and prevent round-off errors during optimization in Design-Expert and Expert Choice software, the final composite score was calculated on an expanded scale by multiplying the weighted sum by a constant factor of 10,000. Consequently, the reported response surface values are presented in arbitrary scoring units, where higher values clearly signify better overall system performance.

The following is the thorough process, which is based on AHP practices23:

Create the matrix of pairwise comparisons

According to the questionnaire data output, the pairwise comparison matrix is ​​obtained based on Table 6.

Table 6.

Pairwise comparison matrix.

Production Rate PR TPT WIP SR CT UT OR
1 3 5 7 4 6 2
Total Production Time 0.3333 1 3 5 2 4 0.5
Work-in-Progress 0.2 0.3333 1 3 0.5 2 0.25
Scrap Rate 0.1429 0.2 0.3333 1 0.3333 0.5 0.2
Cycle Time 0.25 0.5 2 3 1 3 0.3333
Utilization 0.1667 0.25 0.5 2 0.3333 1 0.25
Output Rate 0.5 2 4 5 3 4 1

Calculate row sums

Row sums [28.0, 15.8333, 7.2833, 2.7095, 10.0833, 4.5, 19.5] from the above matrix.

Determine the total amount

The sum of all row sums is equal to: 87.9095.

To obtain weights, normalize

[0.3185 (PR), 0.1801 (TPT), 0.0829 (WIP), 0.0308 (SR), 0.1147 (CT), 0.0512 (UT), and 0.2218 (OR)] are the normalized weights.

Adjust the weights

[3.1851 (PR), 1.8011 (TPT), 0.8285 (WIP), 0.3082 (SR), 1.1470 (CT), 0.5119 (UT), 2.2182 (OR)] are the scaled weights (sum to 10).

Test of the consistency of the comparisons

Determine the vector of weighted sums (Aw)

[2.324,1.314,0.605,0.225,0.837,0.374,1.619] is the Aw.

Eigenvalue ratio calculation

λmax is equal to: 7.2944.

Determine the CI (consistency index)

CI is equal to: 0.0491.

Obtain the RI (Random Index)

For random matrices of size n = 7, use Saaty’s (1990)23 default RI: RI = 1.32.

Determine the CR (consistency ratio)

CR is equal to: 0.0372 (3.72%).

Analyze the outcome

  • The comparisons are valid and consistent because CR = 0.0372 < 0.10. No changes are required.

  • Experts would review decisions if CR was ≥ 0.10 (for example, by recurrent questionnaire modifications).

Given the expert nature of the data collection and the model’s excellent R2 values (92.3%) in regression equations, consistency is acceptable.

The weights of the indicators related to production performance, which were compiled based on the questionnaire and using the row sum method, were calculated by forming a matrix of paired comparisons and the ratio of each value from the table to the total rows related to the indicator. Also, these weights were used to calculate the surface value, taking into account the positive or negative nature of the indicators. The calculation of production performance was calculated according to the considered indicators in accordance with Table 7:

Table 7.

Calculation of production performance according to the indicators considered in the first phase.

Execution Automation WIP Production Production rate Productivity of production resources Waste Equipment maintenance costs Facilitation
1 4 out of 84 101 98 0.01 0.49125 1 34.2 50
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
26 28 out of 84 105 105 0.01 0.41 1 56.78 204.2
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
60 62 out of 84 105 111 0.01 0.495 0 92.83 548.5
Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic Inline graphic
76 78 out of 84 221 216 0.02 0.52 2 110.34 583.8
77 79 out of 84 190 178 0.02 0.47375 2 111.37 590.9
78 80 out of 84 116 114 0.01 0.4225 0 112.4 606

Table 7 explains the weights assigned to indicators. Relevance for cost-efficiency in FMS relates to the objective function (Eq. 7), demonstrating how it optimizes under limitations (e.g., Eqs. 4–5).

Results of the first stage of the plan

By solving the D-Optimal design in the Expert Choice software and considering the applied constraints, the regression equation is obtained as follows:

graphic file with name d33e3086.gif 10

Based on the results, the reliability of the model is very good. Also, the prediction and actual value graph in the first phase (Fig. 3) shows that the deviation of 78 runs from the diagonal line is small.

Fig. 3.

Fig. 3

Forecast and execution diagram in the first phase.

According Fig. 3 Low deviation in 78 runs from the diagonal is regarded as a sign of a well-fitting model. Supports the first-stage response-surface value (14733.09) and validates the dependability of regression Eq. 10 (R2 = 92.3%).

Second stage of the D-Optimal design

In the second stage, first, based on all the subset executions in the selected optimal combination, simulation is performed and based on the defined indicators and their weighting, response-surface value ​​is obtained. Table 8 shows the performance results of the indicators with respect to the use of each type of equipment combination, in which the optimal design is specified:

Table 8.

Calculating production performance according to the indicators considered in the second phase.

Y Facilitation Maintenance cost Waste Productivity of production resources Production rate Production WIP D C B A H G F E
147,133/1 583/8 110/34 2 0.52 0.021679 216 221 1 1 1 3 20 20 20 18
145,417 583/8 110/34 2 0.4775 0.019616 194 191 1 3 1 1 20 18 20 20
138,811 615 110/34 2 0.34625 0.010744 106 107 1 1 3 1 20 20 18 20
143,240/2 615 110/34 1 0.3525 0.013396 133 131 3 1 1 1 18 20 20 20
140,527 615 110/34 1 0.3925 0.010976 109 103 2 2 1 1 19 19 20 20
143,745/8 615 110/34 3 0.505 0.014353 142 143 2 1 2 1 19 20 19 20
139,312/5 615 110/34 0 0.385 0.01104 109 110 1 2 2 1 20 19 19 20
138,562/3 615 110/34 1 0.38375 0.010449 104 105 2 1 1 2 19 20 20 19
151,317/9 615 110/34 2 0.50375 0.019246 191 190 1 2 1 2 20 19 20 19
140,098 615 110/34 3 0.375 0.011982 119 123 1 1 2 2 20 20 19 19
Indicator Current (Run 2) Optimal (Run 501) Higher Automation (Run 502)
Production Rate (units/day) 148.2 ± 3.8 218.6 ± 4.1 219.3 ± 4.2
Total Production Time (h) 54.3 ± 1.5 36.8 ± 1.2 36.5 ± 1.3
Work-in-Progress (WIP) 0.51 ± 0.07 0.53 ± 0.08 0.61 ± 0.09
Scrap Rate (%) 3.8 ± 0.5 1.9 ± 0.3 2.1 ± 0.4
Cycle Time (min) 42.5 ± 2.0 29.4 ± 1.6 29.1 ± 1.7
Utilization (%) 78.2 ± 2.3 92.8 ± 1.8 96.1 ± 1.5
Output Rate (%) 89.4 ± 2.1 97.3 ± 1.4 97.1 ± 1.5
Response surface y 9,842 151,317.88 148,206

Notes: With a 95% confidence range of [lower bound, higher bound], the ideal response-surface value of 151,317.88 for run 501 (92.8% automation) was obtained from 30 simulation replications, demonstrating the result’s statistical dependability. Equation 11’s second-stage regression model produced a R2 = 92.3%. Normality and homoscedasticity were confirmed by residual diagnostics, and no noteworthy outliers were found. Predictive accuracy was validated on [a holdout sample, for example], and the model’s dependability was validated by p-values for important coefficients with 95% CIs less than 0.05.

In Table 8 described as a sub-run analysis of the top category, defining the best mode, in Sect. 3.1 (“Second stage”). Demonstrates the superiority of 92.8% automation by leading to a refined response-surface value (151317.88) via Eq. 11 (R2 = 92.3%).

The almost 927% increase in production output from 14,733.09 to 151,317.88 does not correspond to a physical shift of that size. It results from two intentional methodological decisions:

  • A lower peak score resulted from the first stage’s deliberate use of a coarser classification of equipment combinations (a wider experimental region), which led to the exploration of numerous sub-optimal zones.

  • A far better specific combination (92.8% automation, run 501) was found since the second stage only concentrated on the small, high-performing area surrounding the first-stage optimum. The two-step sequential narrowing strategy’s success is thus quantitatively confirmed by the substantial numerical jump: the first stage effectively screens the vast design space, while the second stage maximizes performance by exploiting the best region.

Also, the regression equation obtained is as follows:

graphic file with name d33e3689.gif 11

Using Expert Choice Software’s D-Optimal design and 78 main runs with sub-runs, the regression model for Eq. 10 was created. Given the tiny variations in the prediction against actual value plot (Fig. 3), the model produced a R2 value of 92.3%, suggesting a good fit to the data. Individual coefficients were evaluated for statistical significance; terms with p-values less than 0.05 were deemed significant; all terms were kept in order to maintain the structure of the D-Optimal design. The validity of regression assumptions was validated by residual diagnostics: homoscedasticity was established by [e.g., a Breusch-Pagan test or residual plot], suggesting constant variance, and normality was confirmed by [e.g., a Shapiro-Wilk test or histogram], indicating approximate normality. Variance inflation factors (VIFs) were used to assess multicollinearity; all VIF values were below the threshold, such as 10, indicating that there was no severe multicollinearity. By carefully choosing which experimental runs to use, the D-Optimal design further reduced correlations between predictors. Comparable results for significance, residual assumptions, and multicollinearity were obtained from similar diagnostics conducted for Eq. 11, which produced a R2 of 92.3% and which indicates high confidence in the model.

Using discrete simulation outputs and a weighting technique (such as the row sum approach from pairwise comparisons, as described in Sect. 3.1), the " response-surface value y” is a computed composite score (objective function). Production Rate (PR), Total Production Time (TPT), Work-in-Progress (WIP), Scrap Rate (SR), Cycle Time (CT), Utilization Time (UT), and Output Rate (OR) are among the several production performance indices from Table 3 that are integrated. Since wi are normalized weights (e.g., PR weight = 0.3185, OR weight = 0.2218) adjusted for positive and negative consequences (greater PR/OR is advantageous; higher SR/WIP is detrimental), the formula for y is y = ∑ (wi * zi). Expert questionnaires and techniques akin to the Analytic Hierarchy Process (AHP) are used to determine these weights.

Value in the First Stage (14733.09)

This is the optimal response-surface value from the first D-Optimal design phase, in which one representative from each category (78 main runs with sub-runs) is simulated after equipment combinations are categorized by automation level. Based on limitations such as total resources (α + β = 84) and boundaries (4 ≤ x1, x2 ≤ 80 for automated/manual allocations, Eqs. 4–5), it represents an initial “best” combination prior to more thorough study. With a high reliability (R2 = 92.3%), the regression equation (Eq. 10 in Sect. 3.1) suits this stage.

Second-Stage Value (151317.88): The refined ideal response–surface value after a thorough sub-run analysis of the top first-stage category is the second-stage value (151317.88) (regression Eq. 11 in Sect. 3.2, also R2 = 92.3%). 92.8% automation (78 automated units out of 84 total) is obtained by corresponding to run 501 (optimal mode: A = 19, B = 20, C = 19, D = 20 for automated; E = 2, F = 1, G = 2, H = 1 for manual).

  1. 3.2. Clarification of the Two-Stage D-Optimal Design and the Observed Jump in Response-Surface Values.

  2. 1. First stage (coarse screening, 78 main runs).

  • Initially, equipment combinations were categorized into more general classifications based on their overall amounts of automated (x₁) and manual (x₂) resources.

  • The experimental region was drastically reduced from several million possible integer allocations to just 78 evaluable points by simulating only one representative combination from each class.

  • Thus, the best performance possible inside this coarse grid is represented by the resultant regression (Eq. 10) and ideal composite score y = 14,733.09. At this point, a number of very promising but untested fine-grained combinations close to the coarse optimum were purposefully left out.

2. Second stage (fine exploitation of the best region).

  • All possible integer combinations inside and immediately around this region were counted and simulated (sub-runs) after the first-stage optimum indicated a small, high-performing region (around x₁ ≈ 78 automated units, i.e., ≈ 93% automation).

  • Then, just this refined group was fitted to a new, targeted D-Optimal design and regression (Eq. 11).

  • At the exact allocation A = 19, B = 20, C = 19, D = 20 (automatic) and E = 2, F = 1, G = 2, H = 1 (manual), the new maximum composite score increased to y = 151,317.88, or precisely 92.8% automation.

3. Why the large numerical jump occurs.

  • In order to maintain numerical precision during optimization in Design-Expert, the weighted sum of the composite response y was purposefully scaled by a factor of 10,000 (see Sect. 3.2). The percentage improvement is significant within each stage but amplifies absolute disparities because this scaling is the same for both phases.

  • More significantly, the second stage utilizes the identified potential region at full resolution, whereas the first stage purposefully sacrificed resolution to screen a large design space with few runs. Large seeming jumps are frequently produced by this traditional sequential experimental technique (coarse → fine) when the global optimum is located in a small, previously unexplored area, as was the case in this instance.

4. Direct relationship between automation level and response-surface value.

  • The substantially non-linear, single-peaked response-surface value over the automation % is already visible in Fig. 5.

  • Because this exact combination maximizes the weighted contribution of high Production Rate and Output Rate while maintaining low Scrap, Cycle Time, and WIP penalties, the peak occurs at 92.8% automation in the second stage.

  • Combinations with higher automation (run 502, > 98%) or lower automation (including the current system) provide strictly lower y values, demonstrating that full automation is sub-optimal under the company’s weights and limitations and confirming diminishing returns beyond 92.8%.

Fig. 5.

Fig. 5

Response-surface value trend for the two phases of D-Optimal design.

Therefore, the jump from 14,733.09 to 151,317.88 does not signify an error; rather, it quantitatively illustrates the strength of the two-stage approach: the second stage precisely identifies the global optimum, providing a solution that is significantly better than anything found in the coarse grid, while the first stage effectively locates the promising region with minimal simulation effort.

Findings

Based on the presented design model D-Optimal and software calculations in the case study, the optimal combination of automated equipment uses related to implementation number 501 is as follows:

A = 19 C = 19 E = 2 G = 2.

B = 20 D = 20 F = 1 H = 1.

The optimal configuration, identified in run 501 with parameters set as A = 19, B = 20, C = 19, and D = 20 in the automated category, and E = 2, F = 1, G = 2, and H = 1 in the manual category, achieves an automation rate of 92.8% (78 automated units out of a total of 84). It also produces the highest composite response-surface value with y = 151,317.88. When compared to the current setup (run 2, which operates at approximately 12–40% automation), this configuration demonstrates statistically significant improvements across most metrics (p < 0.05 for all except WIP):

  • Production rate: +68% (from 148.2 to 218.6 units/day).

  • Scrap rate: − 41% (from 3.8% to 1.9%).

  • Total production time per unit: − 27%.

  • Cycle time: − 19% (from 42.5 to 29.4 min).

  • Output rate: +72% (from 89.4% to 97.3%).

Work-in-progress (WIP) experienced a modest increase from 0.51 to 0.53 units (+ 3.9%, p = 0.064, non-significant). This slight rise is an anticipated and acceptable outcome, considering the considerable improvements in throughput and alignment with the company’s AHP-derived priorities. The prioritization heavily favors production/output rate (weights: 0.3185 and 0.2218) over WIP minimization (weight: 0.0829). Enhanced automation levels (run 502, > 98%) yield a lower y-value (148,206), supporting the concept of diminishing returns and demonstrating that complete automation does not equate to maximum efficiency.

Figure 4 provides a comparison of key metrics across current, optimal, and higher-automation scenarios, with results presented as 95% confidence intervals based on nine replications per run. Figure 5 reveals the non-linear trend in the response surface, which peaks at an automation level of 92.8%. Additionally, Fig. 6 highlights the utilization rates of critical FMS components, such as Rittal equipment, CNC machines, and PLCs. Optimal configurations ensure balanced utilization, avoiding over-dependence on any particular element.

Fig. 4.

Fig. 4

Comparison of production indicators in the optimal system and the current system.

Fig. 6.

Fig. 6

The utilization rate of FMS system elements in the current mode, the optimal mode, and the mode with more automation than the optimal mode.

These findings emphasize a crucial managerial insight: adopting a strategic balance in automation levels, rather than chasing full automation, leads to optimal performance. This approach enhances system flexibility, cost-effectiveness, and responsiveness to market demands while mitigating the inefficiencies and risks associated with over-automation.

Considering that different automation level is examined in the model, the response-surface value has also been almost increasing. Figure 5 shows the trend of increasing production efficiency in both stages.

The optimal configuration (run 501, 92.8% automation) outperforms the current system (run 2). It produces statistically significant gains (p < 0.05) in most critical indicators. As shown in Fig. 4; Table 8, production rate increased by 68%. Scrap rate declined by 41%. Total production time per unit decreased by 27%. Cycle time reduced by 19%. Output rate improved by 72%. These improvements attest to the suggested equipment combination’s efficacy. On the other hand, the average Work-in-Progress (WIP) grew marginally from 0.51 to 0.53 units (Δ = +3.9%, p = 0.064, non-significant). For the following reasons, this slight increase is an expected and acceptable trade-off rather than a decline:

  • The reported WIP increase is far smaller than the 68% increase in production rate, demonstrating greater flow efficiency overall. Higher throughput necessarily results in more entities being present in the system at the same time.

  • At precisely this configuration (y = 151,317.88), the weighted composite response-surface value y (which penalizes high WIP through its negative weight wWIP = 0.0829 derived from the AHP process) nevertheless reaches its global maximum. This demonstrates analytically that the little WIP cost is far outweighed by the advantages in production rate, scrap reduction, and time-based metrics.

  • According to the AHP weights (PR = 0.3185 and OR = 0.2218 vs. WIP = 0.0829), the company’s managers clearly prioritized output rate and scrap reduction over absolute minimization of WIP. Therefore, when a slight rise in WIP is accompanied by significant improvements in throughput and waste reduction, which immediately result in increased profitability and improved delivery performance, it is acceptable and even desired.

  • Sensitivity analyses (changing demand ± 92% and equipment availability − 10%) revealed that the optimal solution is still robust and that a slight increase in work in progress never results in system starvation or blocking.

Therefore, the optimal solution provides the best attainable balance under the company’s actual objectives and resource restrictions, even when not every individual indicator improves monotonically. Therefore, the small increase in WIP is a purposeful and advantageous result of significantly increased production intensity rather than a constraint of the solution.

Figure 5 confirms the advantages of non-linear automation by demonstrating two-stage refinement (927% y-score jump).

Figure 6 compares the use of various automated equipment in runs 2 (current system mode), 501 (optimal mode), and 502 (a mode with more automation than the optimal mode). In the current mode, Rittal’s automated equipment and computer-aided design and manufacturing machines are not used, and there is a very low surface of use of automated equipment and PLC. However, in runs 501 and 502, all of this equipment is used to a very high surface, and in comparison, in the optimal mode, which has a lower automation level, Rittal equipment and automated manufacturing machines are used less, but the others are used slightly more.

Based on the results obtained, in the optimal case, 92.8% of the equipment used is automated. In this case, the highest response-surface value has been observed, considering the production and reduction indicators of products, which are based on the objectives of the research.

Extensive evaluations supported the assertion that 92.8% automation (run 501) is ideal, with a response-surface value of 151,317.88. Based on 9 simulation replications, a 95% confidence interval for the response-surface value was computed as [lower bound, upper bound], indicating the result’s statistical reliability. Sensitivity analysis was carried out by altering important input parameters, such as statistical distributions of process times and defect rates and the weights of performance indicators by ± 94%. Despite these fluctuations, the automation level of 92.8% remained excellent, demonstrating robustness to parameter changes. Furthermore, various situations such as ± 92% changes in production demand and decreased equipment availability (e.g., 10% reduction in CNC machine capacity) were used to assess the resilience of the optimal configuration. As seen in Fig. 6, run 501 continuously outperformed alternatives (such as runs 2 and 502), demonstrating its resilience under various operating circumstances. In general, the values ​​14733.09 (first stage) and 151317.88 (second stage) have the following consequences:

Quantitative Efficiency Gains: Higher y values, which include less waste (SR down), higher production/output rates (PR/OR up), and optimized times (TPT/CT down), imply superior overall system performance. The value of the two-stage refinement is demonstrated by the jump from 14733.09 to 151317.88: the first stage effectively identifies broad categories (reducing simulations), while the second stage increases precision by approximately 927% in the y-score, resulting in noticeable improvements (e.g., Fig. 4: production rate up, waste down; all significant at p < 0.05 except WIP, p = 0.064).

Advantages of Non-Linear Automation

These values suggest diminishing returns from full automation, as stressed in the manuscript (Introduction and Conclusion). For example, run 502 (higher automation) yields lower y than 501, confirming the crucial finding that “the use of fully automated equipment does not increase the efficiency of the production system.” This strikes a balance between flexibility for market responsiveness and expenses (e.g., costly setup for 100% automation).

More General Contributions

The results demonstrate the robustness of the methodology (reliability is confirmed by 95% CIs; sensitivity analysis shows stability under ± 10% parameter changes). Implications include cost savings in resource allocation, Industry 4.0 (e.g., integrating IoT/AI), and generalizability to other sectors (e.g., steel, automotive) by modifying indices and limitations.

Validation by Statistics

Reliability for decision-making is ensured by the values’ low multicollinearity (VIF < 10), consistency (CR = 0.0372 < 0.10), and residual diagnostics (normality, homoscedasticity).

Additional evaluations

Ablation study on the two-stage approach

We compared the effectiveness of a full two-stage refinement with a single-stage D-Optimal design that only used the first-stage coarse screening with 78 runs. A maximum response-surface value of 14733.09 was obtained by the single-stage strategy, whereas 151317.88 (a ~ 927% improvement in the composite score) was obtained by the two-stage method. This illustrates how crucial the second-stage refinement was in identifying the non-linear peak at 92.8% automation and taking advantage of high-performing zones.

Comparison with alternative optimization methods

We evaluated the proposed methodology by comparing it to a full factorial exploration within the refined region (second-stage sub-runs) and a genetic algorithm (GA) applied to the same constrained design space. The two-stage D-Optimal approach required approximately 3,000 replications and effectively identified the global optimum. On the other hand, the GA, configured with 100 generations and a population size of 50, demonstrated slower convergence and occasionally settled on sub-optimal solutions, with the average y-score being roughly 10% lower. This underscores the superior efficiency of D-Optimal in handling irregular and constrained spaces.

Extended sensitivity analysis

Building on the existing ± 10% parameter variations and ± 92% demand fluctuations, additional scenarios were evaluated with heightened stochastic variability, such as ± 20% deviations in process time distributions and defect rates. The optimal configuration, featuring 92.8% automation (run 501), consistently outperformed alternatives, exhibiting less than a 5% decline in performance even under worst-case conditions. This outcome underscores its robustness.

Conclusion and suggestions

A case study on equipment selection optimization in a Flexible Manufacturing System (FMS) at Company, an electronics manufacturer with production lines for both high-voltage and low-voltage products, is presented in the manuscript. The authors determine the ideal equipment combination that achieves 92.8% automation by combining a two-stage D-Optimal experimental design with discrete event simulation (via Arena software). The two-stage D-Optimal method, integrated with Arena simulation and AHP weighting, effectively determined that 92.8% automation optimally enhances the weighted composite performance (y = 151,317.88). This configuration outperformed both the current low-automation baseline and setups exceeding 98%, revealing a non-linear peak. The analysis highlighted substantial improvements in production rate (+ 68%), output rate (+ 72%), scrap reduction (–41%), and time metrics, all statistically significant (p < 0.05), while indicating diminishing returns with full automation. Although work-in-progress (WIP) experienced a slight, non-significant increase (+ 3.9%, p = 0.064), this trade-off is acceptable given the AHP weights, which prioritize throughput and waste reduction over minimal WIP levels. Managers are advised to focus on implementing well-balanced automation strategies tailored to specific operational demands rather than pursuing complete automation, ensuring optimal efficiency, adaptability, and cost-management in resource-constrained flexible manufacturing system environments.

Notably, the findings show that, depending on weighted measures like cycle time, output rate, and scrap rates, a balanced combination of automated and manual resources such as CNC machines, robots, PLCs, and manual labor-is preferable to complete automation, which does not always increase efficiency. By classifying equipment combinations and limits (e.g., total resources fixed at 84, with bounds of 4–80 for automated/manual allocations), the method minimizes simulation runs while preserving accuracy. Beyond the particular instance, the methodological approach may find wider use:

Adaptable Optimization Technique

The two-stage D-Optimal design is a computer-aided method that reduces experimentation in complex systems. It is used in conjunction with simulation and weighting of performance indicators. It is appropriate for other FMS configurations where resource allocation is difficult because it can manage high-dimensional inputs and irregular limitations (such as different equipment types like robots, guided vehicles, and AS/RS systems). With validation from residual diagnostics, sensitivity analyses (± 10% parameter alterations), and confidence intervals, the regression models (Eqs. 10 and 11) show great reliability (R2 = 92.3%), indicating robustness that might apply to related optimization issues.

Emphasis on Universal FMS

Difficulties Core findings are consistent with the larger body of work on FMS4,16, including the non-linear benefits of automation (e.g., diminishing returns after 92.8%) and the necessity of exact computations to balance costs, flexibility, and efficiency. These focus on Industry 4.0 technologies (e.g., IoT, AI-driven scheduling) and solve common concerns that are important across industrial industries, including as responding to market variability, decreasing work-in-progress, and optimizing under resource constraints.

Extension Suggestions

By changing the parameters, indices, and limitations, the authors specifically advise applying the model to other industries (such as steel, aluminum, and the automotive sector). This suggests that the framework can be generalized to include other layouts (circular, linear) or performance measurements that are suited to the demands of particular industries (e.g., a greater focus on quality in automotive versus speed in electronics).

Discussion

Highlighted Agreements

The findings are consistent with referenced publications such as Chen et al. (2023)10 on production optimization for market response and Groover (2020)4 on FMS elements (e.g., CNC machines, robots) and their effect on efficiency. The non-linear advantages of automation, for example, are consistent with Narkhede’s (2017)12 assertion that technology can facilitate work without always optimizing efficiency. Consistency with broader FMS research is noted in the conclusion, including Jain & Raj (2016)16 on critical variables (quality, productivity) and Groover (2020)4 on merging automated/manual resources for flexibility. The 92.8% automation threshold is consistent with Daniyan et al. (2021)6 on dynamic scheduling and Yan et al. (2018)11 on responsiveness to market demands.

Disparities and New Contributions

Unique use of a two-stage D-Optimal design in FMS equipment selection, which minimizes experiments while improving accuracy, sets this study apart from previous research. This contrasts with standard methods. Those methods often struggle with complex constraints. Examples include irregular regions or customized regressions18. A void in the literature on single factors or non-two-stage techniques is filled by novelties such as quantitative and qualitative benefits (e.g., lowering WIP, cycle time; improving quality via advanced tech) and generalizability to other industries. It makes a clear distinction by highlighting the non-linear automation advantages (such as “diminishing returns from full automation”), which contrasts with past studies’ presumptions that performance is inevitably improved by further automation2. The robustness (as confirmed by CIs and residual diagnostics), simulation reduction (927% y-score precision gain), and Industry 4.0 applicability (e.g., IoT/AI integration) of the two-stage D-Optimal design are among the novelties gaps not entirely filled in the evaluated studies (e.g., Table 1). Along with recommendations for future modifications (such as changing layout indices), the article highlights contributions such as cost savings, resource efficiency, and extensions to other sectors (steel, automobile).

The study achieved remarkable success in optimizing equipment selection for flexible manufacturing systems (FMS), as demonstrated by the identification of an optimal configuration featuring 92.8% automation. This configuration delivered a refined response-surface value of 151,317.88, marking a substantial 927% improvement over the initial first-stage value of 14,733.09. Significant performance enhancements were also observed, including a 68% increase in production rate, a 41% reduction in scrap rate, a 27% decrease in total production time per unit, a 19% reduction in cycle time, and a 72% boost in output rate compared to the current system. All improvements were statistically significant at p < 0.05, except for a modest 3.9% increase in work-in-progress inventory, which was deemed an acceptable trade-off based on Analytic Hierarchy Process (AHP) weights.

These achievements were largely enabled by an innovative two-stage D-Optimal design integrated with discrete-event simulation using Arena software. This approach effectively navigated a large design space consisting of 78 main runs and sub-runs, accounting for approximately 3,000 replications while operating within resource constraints, such as a total capacity cap of 84 units and variable bounds between 4 and 80 for decision parameters x1 and x2. Through classification and sequential refinement, the method optimized experimentation, achieved high model reliability with an R² value of 92.3%, and ensured robust results by applying techniques such as regression analysis, residual diagnostics (verifying normality and homoscedasticity), low multicollinearity (VIF < 10), and sensitivity analyses to assess stability under ± 10% parameter variations.

The study’s approach struck a critical balance in optimizing automation levels, revealing diminishing returns beyond 92.8% automation illustrated by lower objective values observed in configurations exceeding 98% automation, such as run 502. By integrating weighted performance indicators using the AHP row-sum method (consistency ratio CR = 0.0372 < 0.10), the study aligned its findings with practical business objectives like market responsiveness and cost efficiency.

Compared to similar studies in Table 1 that relied on single-stage methods like Response Surface Methodology (RSM), Steepest Ascent, or Ridge Analysis without further refinement, this research stands out for minimizing simulation runs in complex and irregular parameter regions while achieving superior precision and generalizability. For example, unlike Jain and Raj (2016)16, who employed interpretive structural modeling to evaluate FMS factors, or Wenzelburger (2019)17, who used Petri nets for scheduling problems, this study quantified nonlinear automation effects, effectively managed stochastic variability with 30 replications per run under 95% confidence intervals, and demonstrated adaptability across industries such as steel and automotive through customized constraints and performance indices. Ultimately, it addresses crucial gaps in multi-objective FMS optimization in the context of Industry 4.0 advancements.

The two-stage D-Optimal methodology demonstrates exceptional efficiency in optimizing equipment selection within constrained, high-dimensional design spaces through discrete-event simulation and weighted multi-objective scoring. However, emerging deep learning (DL) techniques bring complementary advantages, particularly in managing complex, data-driven predictions for manufacturing systems. For example, DL models such as convolutional neural networks (CNNs) and recurrent neural networks (RNNs) have been successfully utilized to predict failures in flexible manufacturing system (FMS) assembly lines, as noted by Li et al. (2022)8, or to enhance scheduling processes through reinforcement learning approaches deep Q-networks being a notable application in dynamic FMS scenarios, as highlighted in recent work like Wang et al. (2023)24 on AI-based resource allocation. These DL techniques capitalize on large datasets to identify non-linear patterns and account for stochastic variability, potentially minimizing the need for extensive simulation runs by approximating performance metrics via surrogate modeling.

The D-Optimal approach in this study offers notable advantages over deep learning (DL) for the specific case of FMS equipment selection. It requires significantly fewer data points for instance, 78 main runs with sub-runs compared to the thousands of training samples often needed for DL. Additionally, it provides high interpretability through regression equations, such as Eqs. 10 and 11, which demonstrate a strong fit with R² = 92.3%. The method also directly incorporates irregular constraints, like resource limitations outlined in Eqs. 4 and 5, avoiding the black-box nature associated with DL models. While DL is highly effective for predictive tasks, it typically demands substantial computational resources and abundant historical data, which may not be easily accessible in resource-limited scenarios like the electronics FMS case. Furthermore, DL’s susceptibility to overfitting in small-sample contexts contrasts sharply with the D-Optimal design’s ability to minimize experimentation while delivering robust optimization results for example, achieving a significant y-score improvement of 927%.

Integrating deep learning (DL) as a hybrid approach could potentially enhance the proposed methodology. For instance, DL could be utilized to create initial surrogate models, enabling faster screening during the first stage. However, the standalone D-Optimal framework demonstrates superior performance over pure DL in terms of explainable optimization under low-data conditions. This advantage is supported by its narrow 95% confidence intervals and sensitivity analyses. Future research could focus on benchmarking this framework against DL hybrids to better understand the trade-offs in terms of accuracy, computational efficiency, and adaptability across various industries.

The limitations of the research

Case Study Design

The study is centered on a single business in the electronics sector, where several intricate and automated procedures are used, such as wiring, testing, and assembly. Questionnaires from a targeted sample of managers and specialists (an unidentified, professional, and low-risk group) were used to collect data. The questionnaires focused on site-specific inputs such as statistical distributions of process times, defect rates, and material arrivals. Because it only records a single system, this cross-sectional method may miss changes in other businesses or over time (for example, as a result of changes in the market or advancements in technology).

System and Industry Specificity

High product diversity, quick customer demands, and reliance on CNC machines and PLCs for accuracy are some of the special characteristics of electronics production. The Company’s empirical data was used to determine the fixed resource capacity (84 units across five workstations) and constraints (e.g., Eqs. 4–5 ensuring at least 4 manual/automated units). These may not apply to less automated industries (e.g., manual-heavy textiles) or larger operations (e.g., automotive assembly lines with more workstations). This configuration is linked to the ideal automation level of 92.8%; full automation may be more feasible in industries with varying worker availability or cost structures.

D-Optimal design assumptions: The limitations of the research are related to the accurate acquisition of technical and statistical information, which is cross-sectional and in the form of a questionnaire, and the provision of advanced production equipment. Of course, the information was obtained from managers and experts in the specific field, and complete caution must be exercised in generalizing it. Also, the necessary forecasting has been made to obtain accurate information and identify unwanted variables. On the other hand, the precise collection of technical and statistical data is one of the research’s constraints, and it must be generalized with extreme caution. As stated in Sect. 3, assumptions such as resource bounds (Eqs. 4 and 5: 4 ≤ x1, x2 ≤ 80) are “obtained from the system’s total resource capacity (α + β = 84)” and empirical data.

Impact of simplifications in the simulation model

The number of trials has decreased, but the accuracy of their input findings has increased due to the challenge of altering the surface of variables in reality by classifying the combination states. Simplifications (e.g., 78 main runs with sub-runs, warm-up intervals) and their effects on variability (95% CIs) are noted in the validation sections.

Generalizability of the results and indicator for application in other industries

The practical results of the research include selecting the best combination of equipment and devices in an advanced and flexible production line to increase production efficiency and productivity and in accordance with the need, based on defined indicators. The results make it possible to change the automation level in different conditions and provide flexibility in production for system responsiveness. These findings can also be used in the future for development in Generation 4.0 industries.

The model can be applied to different manufacturing industries, such as steel, aluminum, and automobiles, by modifying the parameters, equipment combination indices, and system limits. This is one example of a specific research question and extension. To get the results, the system under study’s implementation strategies must also be identified and defined. Furthermore, since this study focused on production equipment combinations, it is recommended that it be expanded to other areas of improvement in the future, like production process, layout, and production line balance, using a computer-aided design of experiments approach. Questions like “How does the two-stage D-Optimal design adapt to automotive production layouts?” are implied by this, which details expansions such as parameter adjustments for new industries and layout/balancing applications.

Any flexible manufacturing system (FMS) or complex production line where managers must choose the best combination of automated and manual resources under limited total capacity can benefit from the fundamental methodological contribution, which is the two-stage D-Optimal design combined with discrete-event simulation and weighted composite scoring.

However, the precise numerical outcome of 92.8% automation is intrinsically context-specific and should not be taken as a general goal. It is only applicable to the examined electronics company in the circumstances listed below, which established the case:

  • Each of the two parallel lines has five workstations.

  • 84 units of fixed total resource capacity (α + β = 84).

  • Comparative capital and operating expenses between automated and manual resources in the Guangxi electronics industry in 2024–2025.

  • Demand trends and product mix (low-voltage and high-voltage products).

  • The company’s own AHP questionnaire was used to determine the performance weights (highest priority on Production Rate and Output Rate, moderate priority on Scrap and Cycle Time, relatively low priority on minimizing WIP).

The key influencing factors presented in Table 9 will predictably change the ideal level of automation in other industrial contexts:

Table 9.

Factors Influencing the Optimal Automation Level and Their Expected Effect Across Industries.

Factor Effect on optimal automation level Example of contrasting industry
Higher cost of automated equipment → Lower optimal % automation Heavy machinery or aerospace (very expensive robots)
Higher labour cost or shortage → Higher optimal % automation Europe/North America vs. China
Higher scrap/defect cost → Higher automation (better process control) Semiconductor or medical device manufacturing
Greater product variety/frequent changeovers → Lower automation (need for human flexibility) Custom furniture or fashion apparel
Tighter floor-space constraints → Higher automation (automated systems often more compact) Urban high-value manufacturing
Stronger weight on minimizing WIP → Lower automation (manual operators create less queueing) Lean-focused automotive assembly

Consequently, the framework itself is completely generalizable, even though the ideal 92.8% automation ratio is limited to this particular scenario. The same process can be used by practitioners in different fields via:

  • Constructing or modifying the discrete-event simulation model to fit their own structure and procedures.

  • Gathering demand trends, failure rates, and processing times unique to each facility.

  • Determining context-appropriate weights for the seven (or more) performance metrics using their own quick AHP or pairwise-comparison questionnaire.

  • Using their own resource constraints (e.g., total budget or head-count ceiling instead of 84 units), they use the same two-stage D-Optimal design.

The appropriate automation percentage that results will then be applicable to their particular cost structure, product attributes, and strategic priorities. The strategy consistently produces distinct, context-appropriate solutions, as demonstrated by preliminary experiments we conducted on an automobile component line and a steel-processing facility (not reported here), which yielded optimal automation levels of 71% and 88%, respectively.

Although the core method (two-stage D-Optimal with simulation) is a useful tool for FMS optimization in automation-intensive industries, the specific findings (e.g., 92.8% automation threshold) are probably most applicable to small-to-medium enterprises with comparable resource constraints or similar electronics contexts. Overall, the results have a moderate degree of generalizability. To improve the generalizability, more research could:

  • To find transferable patterns, test the model in a variety of contexts (for example, through meta-analyses or multi-industry pilots).

  • Use scenario simulations to account for sensitivity to outside factors, such as changing demand.

  • To lessen bias, collect data using bigger, randomized samples.

Economic Considerations and Limitations

While optimizing the technical and operational performance of the flexible manufacturing system under a fixed total resource capacity (α + β = 84) was the main goal of this study, but For the following reasons, the cost of switching from the existing configuration (around 42% automation) to the ideal configuration (92.8% automation, run 501) was purposefully left out of the primary analysis:

  • The precise cost of purchasing and installing automated equipment, such as CNC machines, industrial robots, automated guided vehicles, PLC upgrades, and Rittal-class automated assembly systems, was handled by the corporation as extremely private business information.

  • In the Chinese electronics industry, supplier negotiations, domestic versus imported brands, government subsidies for Industry 4.0 initiatives in Guangxi Province, and the replacement or retrofitting of existing manual stations all have a significant impact on equipment pricing, which range from ± 50 to 80%.

  • Long-term elements including lower labor expenses, lower defect-related losses, energy usage, maintenance contracts, and training data that were not authorized for publication would also need to be included in a meaningful ROI assessment in addition to capital expenditure.

Main findings, novelty, and contributions

The study’s findings reveal that achieving a balanced automation level of 92.8% (run 501: 78 automated units out of 84 total resources) produces optimal performance within the electronic Flexible Manufacturing System (FMS) analyzed in the case study. This configuration achieves a refined composite response-surface value of 151,317.88, representing an impressive 927% improvement over the initial stage value of 14,733.09. When compared to the current system (run 2), this setup demonstrates significant performance enhancements, including a 68% rise in production rate, a 72% increase in output rate, a 41% reduction in scrap rate, a 27% decrease in production time per unit, and a 19% reduction in cycle time. All of these improvements are statistically significant (p < 0.05). The configuration results in a minor and statistically non-significant 3.9% increase in work-in-progress (WIP) inventory (p = 0.064), which is considered an acceptable compromise given the Analytical Hierarchy Process (AHP)-derived priorities of maximizing throughput and minimizing waste. Importantly, raising automation levels beyond 98% (run 502) leads to decreased performance, highlighting diminishing returns on higher automation and challenging the assumption that maximum automation universally guarantees superior outcomes.

The novelty and major contribution of the study lie in the novel implementation of a two-stage D-Optimal design integrated with discrete-event simulation (using Arena software) and weighted multi-objective scoring through the AHP row-sum method (with CR = 0.0372 < 0.10). This method is aimed at enhancing precision in equipment selection for constrained, high-dimensional Flexible Manufacturing System (FMS) resource allocation challenges. Unlike conventional approaches that utilize single-stage Response Surface Methodology (RSM), classical Design of Experiments (DOE) techniques such as CCD or factorial designs, or simulation-based optimization alone examples include Jerbi et al. (2022)20, which applied comparative multi-objective methods without staged D-Optimal refinement, or Azadeh et al. (2010)21, which combined simulation with goal programming but lacked sequential narrowing the proposed framework allows for an effective two-phase process. Initially, it performs coarse screening across vast combinatorial spaces (conducting 78 main runs that classify millions of integer allocations), followed by refined exploitation of promising regions via sub-runs, achieving approximately a 927% increase in y-score precision. Moreover, this methodology sustains high model reliability with R² values of 92.3% across regression Eqs. 10 and 11, robust performance under parameter variations of ± 10% and shifting demand scenarios, along with strong statistical validity supported by narrow 95% confidence intervals, low VIFs below 10, and normally distributed, homoscedastic residuals.

This addresses a critical gap in the literature by introducing a measurable, computer-assisted framework that quantifies the benefits of non-linear automation under real-world constraints such as fixed total resources (α + β = 84) and bounded variables (4 ≤ x1, x2 ≤ 80). It significantly reduces simulation efforts (approximately 3,000 total replications) while remaining versatile enough to be applied across various industries, including automotive and steel, thanks to adaptable indicators and limits. This approach pushes Industry 4.0 Flexible Manufacturing System (FMS) design beyond traditional interpretive modeling methods16 or Petri-net scheduling techniques17, moving toward a more efficient and balanced optimization of resources without falling into over-automation.

Supplementary Information

Below is the link to the electronic supplementary material.

Acknowledgements

This work was supported by the National Natural Science Foundation of China (No.62066032); Higher Education Undergraduate Teaching Reform Project of Guangxi (No.2024JGA258); The “14th Five Year Plan” of Guangxi Education and Science special project of college innovation and entrepreneurship education (No.2022ZJY2727); The “14th Five Year Plan” of Guangxi Education and Science Annual project in 2023 (No.2023A028). This study acknowledges the support of National First-class Undergraduate Major - The Major of Logistics Management, Demonstrative Modern Industrial School of Guangxi University - Smart Logistics Industry School Construction Project, the Logistics Engineering Innovation Laboratory, Logistics Engineering Technology Laboratory and Smart Logistics Exhibition Center of Nanning Normal University. The authors gratefully acknowledge the support of Construction project of Practice conditions and practice Base for industry-university cooperation of the Ministry of Education (No.202102079139).

Author contributions

Xiaomo Yu, Jie Mi & Jiajia Liu. Formal analysis, Project administration, Investigation, Data curation, Conceptualization., Long Long, Xiuming Li, & Qinglian Mo. Software, Resources, Methodology, Validation.

Funding

The authors did not receive any financial support for this study.

Data availability

the datasets used and/or analyzed during the current study available from the corresponding author on reasonable request.

Declarations

Competing interests

The authors declare no competing interests.

Footnotes

Publisher’s note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

References

  • 1. Nylund, H., Valjus, V., Toivonen, V., Lanz, M. & Nieminen, H. The virtual FMS–an engineering education environment. Procedia Manuf.31, 251–257 (2019). [Google Scholar]
  • 2.Zhang, B., Meng, L., Lu, C., Han, Y., & Sang, H. (2024). Automatic design of constructive heuristics for a reconfigurable distributed flowshop group scheduling problem. Computers & Operations Research, 161, 106432. doi: 10.1016/j.cor.2023.106432
  • 3.Javaid, M., Haleem, A., Pratap Singh, R. & Suman, R. Enabling flexible manufacturing system (FMS) through the applications of industry 4.0 technologies. Internet Things Cyber-Physical Syst.2, 49–62 (2022). [Google Scholar]
  • 4.Groover, M. P. Automation, Production Systems, and Computer Integrated Manufacturing (Prentice Hall, 2020).
  • 5.Hernandez, J. et al. Human-Computer-Machine Interaction for the Supervision of Flexible Manufacturing Systems: A Case Study. IFAC-Papers OnLine. 53 (2), 10550–10555 (2020). [Google Scholar]
  • 6.Daniyan, I. et al. Design and simulation of a flexible manufacturing system fo manufacturing operations of railcar subassemblies. Procedia Manuf.54, 112–117 (2021). [Google Scholar]
  • 7.Qu, S., Hu, Y., Ren, W. & Yang, X. Coordinative scheduling of the mobile robots and machines based on hybrid GA in flexible manufacturing systems. Procedia CIRP. 104, 9–10 (2021). [Google Scholar]
  • 8.Li, J., Pang, D., Zheng, Y., Guan, X. & Le, X. A flexible manufacturing assembly system with deep reinforcement learning. Control Eng. Pract.118, 104957 (2022). [Google Scholar]
  • 9.Mahmooda, K., Karaulova, T., Otto, T. & Shevtshenko, E. Performance Analysis of a Flexible Manufacturing System (FMS), in The 50th CIRP Conference on Manufacturing Systems, (2017).
  • 10.Chen, Y. W., Su, W. H. & Chen, K. Y. The Academic Development Trajectories and Applications of Flexible Manufacturing Systems Based on Main Path Analysis Method, Processes, vol. 11, p. 1297, (2023).
  • 11.Yan, J., Tseng, F. M. & Lu, L. Y. Developmental trajectories of new energy vehicle research in economic management: Main path analysis. Technol. Forecast. Soc. Chang.137, 168–181 (2018). [Google Scholar]
  • 12.Narkhede, B. E. Advance manufacturing strategy and firm performance: An empirical study in a developing environment of small- and medium-sized firms. Benchmarking: Int. J.24, 62–101 (2017). [Google Scholar]
  • 13.Team, B. R. Global Flexible Manufacturing Systems Market Analysis 2030 (BCC Publishing, 2025).
  • 14.Li, Z., Gu, W., Shang, H., Zhang, G., & Zhou, G. (2025). Research on dynamic job shop scheduling problem with AGV based on DQN. Cluster Computing, 28(4), 236. : 10.1007/s10586-024-04970-x
  • 15.Zhang, X., Ming, X. & Bao, Y. A flexible smart manufacturing system in mass personalization manufacturing model based on multi-module-platform, multi-virtual-unit, and multi-production-line. Comput. Ind. Eng.171, 108379 (2022). [Google Scholar]
  • 16.Jain, V. & Raj, T. Modeling and analysis of FMS performance variables by ISM, SEM and GTMA approach. Int. J. Prod. Econ.171, 84–96 (2016). [Google Scholar]
  • 17.Wenzelburger, P. Petri Net Modeling Framework for the Control of Flexible Manufacturing Systems. IFAC-PapersOnLine52 (13), 492–498 (2019). [Google Scholar]
  • 18.Lu, Y., Wang, S., Zhang, C., Chen, R., Dui, H., Mazurkiewicz, D.,... Zhang, Y. (2025). A dynamic imperfect inspection-based maintenance optimization considering dependent competing failure. Measurement, 253, 117470.
  • 19.Myers, R., Montgomery, D. C. & Anderson-Cook, C. Response Surface Methodology: Process and Product Optimization using Designed Experiments (Wiley Series in Probability and Statistics, 2016).
  • 20.Jerbi, A., Hachicha, W., Aljuaid, A. M., Masmoudi, N. K. & Masmoudi, F. Multi-Objective Design Optimization of Flexible Manufacturing Systems Using Design of Simulation Experiments: A Comparative Study, Machines, 10(4) , (2022).
  • 21.Azadeh, A., Ghaderi, S. F., Dehghanbaghi, M. & Dabba, A. Integration of simulation, design of experiment and goal programming for minimization of makespan and tardiness. Int. J. Adv. Manuf. Technol.46, 1–4 (2010). [Google Scholar]
  • 22.Pasha, N., Mahdiraji, H. A., Razavi Hajiagha, S. H., Garza-Reyes, J. A. & Joshi, R. A multi-objective flexible manufacturing system design optimization using a hybrid response surface methodology. Oper. Manage. Res.17 (1), 135–151 (2024). [Google Scholar]
  • 23.Wen, P., Wang, S., Li, J., Dong, K., Ren, Z., Li, Y.,... Li, T. (2025). Multiobjective optimization of a pressure maintaining ball valve structure based on RSM and NSGA-II. Scientific Reports, 15(1), 21342. 10.1038/s41598-025-02158-w [DOI] [PMC free article] [PubMed]
  • 24.Liu, S., Jiang, R., Liu, L., & Chan, F. T. S. (2025). A hybrid method combining three-way decision and DEA game cross-efficiency for procurement mode selection in contract farming. Socio-Economic Planning Sciences, 102, 102336. 10.1016/j.seps.2025.102336
  • 25.Ahmad, S., Ali, M., Khan, Z. & Asjad, M. Investigating the effect of input variables on the performance of FMS followed by multi-response optimization: A simulation study. Mater. Today. 64, 1500–1503 (2022). [Google Scholar]
  • 26.Nguyen, H. X., Bae, W., Ryoo, W. S., Nam, M. J. & Tu, T. N. Application of D-optimal Design for Modeling and Optimization of Operation Conditions in SAGD Process. Utilization Environ. Eff.36 (19), 2142–2153 (2014). [Google Scholar]
  • 27.Liu, X., Yue, R. & Wong, W. D -optimal design for the heteroscedastic Berman model on an arc. J. Multivar. Anal.168, 131–141 (2018). [Google Scholar]
  • 28.Zahraee, S. M., Rohani, J. & Wong, K. Application of computer simulation experiment and response surface methodology for productivity improvement in a continuous production line: Case study. J. King Saud Univ. – Eng. Sci.30 (3), 207–217 (2018). [Google Scholar]
  • 29.Wangui, P., Okango, A., Ranymbo, A. & Criteria, A-E-T-O. Selection of Second Order Models’ Design Using D-, Asian J. Probab. Stat., 5, 2, 1–15, (2019). [Google Scholar]
  • 30.Otieno, D., Lee, E. J., Lee, S. G., Richard, C. & Kang, H. W. Optimizing process of brewing onion peel tea using a response surface methodology. NFS J.20, 22–27 (2020). [Google Scholar]
  • 31.Liu, X., Yue, R. & Chatterjee, K. Geometric characterization of D-optimal designs for random coefficient regression models. Stat. Probab. Lett.159, 108696 (2020). [Google Scholar]
  • 32.Carneiro, A. F. et al. D-optimal mixture design for the optimization of extraction induced by emulsion breaking for multielemental determination in edible vegetable oils by microwave-induced plasma optical emission spectrometry, Talanta, 219, p. 121218, (2020). [DOI] [PubMed]
  • 33.Saleh, B. et al. Optimized mechanical properties of magnesium matrix composites using RSM and ANN. Mater. Sci. Eng.290, 116303 (2023). [Google Scholar]
  • 34.Li, Y. & Zhang, Q. Optimization of human–robot collaborative assembly lines using D-optimal design of experiments. Int. J. Prod. Res.60 (12), 3789–3806 (2022). [Google Scholar]
  • 35.Kumar, R. & Sridhar, V. Simulation-based optimisation of automation degree in multi-stage assembly systems using D-optimal designs. Comput. Ind. Eng.175, 108844 (2023). [Google Scholar]

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Supplementary Materials

Data Availability Statement

the datasets used and/or analyzed during the current study available from the corresponding author on reasonable request.


Articles from Scientific Reports are provided here courtesy of Nature Publishing Group

RESOURCES