Table 2.

Comparative analysis of construction costs between overhead transmission lines and underground tunnel transmission

Construction Information OHL AC OHL DC UGC AC GIL
Rated voltage 500 kV ±600 kV 420 kV 1000 kV
Rated power 2598MVA 2400 MW 7482MVA 10,000MVA
Lifecycle 30years 30years

XLPE cable:

30years

Tunnel: 50years

GIL: 50years

Tunnel: 50years

Capital cost 407,450$/km 294,643$/km

72,164,405$/km

(Cable:42.5%

Tunnel:57.5%)

100,812,125$/km
Station type AC substation DC converter station AC substation GIL incoming station
Station cost (at both ends) 333,949,072$ 750,800,000$ 436,226,676$ 138,098,896$
Operation cost(line) 5% capital cost/year 1% capital cost/year 0.5% capital cost/year 0.5% capital cost/year
Operation cost(station) 2% construction cost/year 1% construction cost/year 2% construction cost/year 1% construction cost/year
Energy loss 6.70%/1000 km 3.50%/1000 km 11.91%/1000 km 6.71%/1000 km
Ecological and landscape cost

938,022

$/(year·km)

(WTP)

938,022

$/(year·km)

(WTP)

14,000

$/(year·km)

17,000

$/(year·km)

OHL overhead line, UGC underground cable, GIL gas-insulated line, AC alternating current, DC direct current, XLPE cross-linked polyethylene, WTP willingness to pay (applied to ecological and landscape cost valuation).