| Activated carbon (bio-based) |
Real wastewater |
3–5 cycles |
Batch |
Reduced efficiency due to NOM |
99
|
| Chitosan-based adsorbents |
Synthetic + real water |
4–6 cycles |
Batch |
Structural instability after reuse |
100
|
| Agricultural waste-derived adsorbents |
Wastewater |
2–4 cycles |
Batch |
Limited durability |
101
|
| Graphene oxide composites |
Synthetic solutions |
3–5 cycles |
Batch |
High cost, scalability issues |
105
|
| Carbon nanotubes |
Synthetic water |
3–4 cycles |
Batch |
Aggregation, regeneration loss |
102
|
| Biochar-based adsorbents |
Real wastewater |
5–10 cycles |
Batch/column (limited) |
Fouling, variable performance |
104
|
| Fixed-bed systems (various adsorbents) |
Wastewater |
Continuous |
Column |
Breakthrough limitations |
103
|
| Nanocomposites (metal oxide-based) |
Synthetic + limited real samples |
3–6 cycles |
Mostly batch |
Scale-up challenges |
106
|