Skip to main content
. 2026 May 21;16:23344. doi: 10.1038/s41598-026-48956-8

Table 2.

Life cycle inventory of each stage.

Process Inputs Outputs
Flows Regional datasets Amount Flows Amount
CBPG preparation Coal fly ash RoW 0.8 kg CBPG, produced 1 kg
Sodium silicate RoW 0.23016 kg
NaOH RoW 0.09072 kg
H2O2 RoW 0.02664 kg
Olive oil GLO 0.0184 kg
Deionized water RoW 0.24 kg
Electricity CN, XJ 0.24 kWh
Transport, lorry RoW 0.2576 tkm
Transport, train CN 1.0302 tkm
Adsorption Pb2+ CBPG, produced / 3.78E-6 kg Pb2+ removed 1 mg
Electricity CN, XJ 4.73E-4 kWh CBPG spent 3.78E-6 kg
MB CBPG, produced / 1.52E-5 kg MB removed 1 mg
Electricity CN, XJ 8.45E-4 kWh CBPG spent 1.52E-5 kg
CBPG spent landfill Transport, lorry RoW 0.025 tkm CBPG spent 1 kg
Hazardous waste, for underground deposit / 1 kg

(Notes: Electricity consumption is based on the low-voltage electricity mix from the openLCA background database. Transportation distances in Xinjiang were estimated according to laboratory-scale procurement conditions with an assumed 80% railway and 20% road transport structure.)