Skip to main content
. 2026 Aug 10;16(9):710. doi: 10.21037/qims-2026-0530

Table 3. Interobserver agreement of SWE results between two methods.

Parameters Method 1 Method 2 (anterior wall) Method 2 (posterior wall)
Emean (95% CI) 0.956 (0.932–0.971) 0.996 (0.994–0.997) 0.996 (0.994–0.997)
Emax (95% CI) 0.850 (0.785–0.894) 0.965 (0.951–0.974) 0.989 (0.985–0.992)
Emin (95% CI) 0.934 (0.912–0.951) 0.955 (0.936–0.968) 0.970 (0.958–0.979)

CI, confidence interval; Emax, maximum elasticity; Emean, mean elasticity; Emin, minimum elasticity; SWE, shear wave elastography.