Skip to main content
. 2004 May;19(5 Pt 2):496–500. doi: 10.1111/j.1525-1497.2004.30102.x

Table 1.

Resident Projects Completed During the Practice-based Learning and Improvement Elective

Although 11 residents completed the elective, two residents collaborated on one project, so there are a total of 10 projects.
• Coordinating follow-up after admission for acute pain crisis from sickle cell disease
• Reducing needle stick injuries for medical students and residents
• Increasing screening for depression in a transgender clinic
• Increasing the use of maximum sterile barrier precautions in the Medical Intensive Care Unit to decrease catheter-related infections
• Examining the effectiveness of a computerized medical record alert in identifying beta blocker use candidates
• Determining the effectiveness of inpatient initiation of anticoagulation with warfarin
• Providing safe, cost-efficient, and effective outpatient anticoagulation with Lovenox
• Decreasing barriers to advance care planning discussion in the outpatient setting
• Assessing osteoporosis knowledge and risk factors of clinic patients
• Determining whether a heart failure database can be useful in improving quality of care