Skip to main content
. 2007 Jul 6;3(7):e126. doi: 10.1371/journal.pcbi.0030126

Figure 1. Pipeline Flowchart.

Figure 1

The boxes with solid lines indicate steps involving intensive computation (approximate running time is specified next to each). Other intermediate steps are specified in the boxes with dashed lines.