Skip to main content
. 2007 Jul;88(1):29–49. doi: 10.1901/jeab.2007.122-04

Table 1.

Time (T) and probability (p) values used to program the random-interval (RI) schedule, RI values, and fixed-time (FT) values.

Rat RI value  =  T/p
Tandem schedule values
T (s) p RI FT
R1, R2, R3 4 0.125 32 0
R4, R5, R6 4 0.129 31 1
R7, R8, R9 4 0.133 30 2
R10, R11, R12 4 0.142 28 4
R13, R14, R15 4 0.166 24 8
R16, R17, R18 4 0.250 16 16
R19, R20, R21 0 1.000 0 32