Skip to main content
. 2007 Aug 22;2(8):e771. doi: 10.1371/journal.pone.0000771

Figure 7. Grand average back-projections of the IC-RS.

Figure 7

The significant difference in the projections at the electrodes between unimodal and crossmodal tasks are labeled with asterisks in three durations: 30∼70 ms (yellow), 70∼100 ms (gray), 100∼160 ms (green).