Skip to main content
. 2007 Aug 8;104(33):13268–13272. doi: 10.1073/pnas.0611508104

Fig. 5.

Fig. 5.

Critical time (Tc) required to erode a soil profile of differing initial thickness (S) for different net soil erosion rates set by the difference between rates of soil erosion (E) and production (P), defined by Tc = S/(E−P).