Skip to main content
. 1998 Jul 1;510(Pt 1):287–295. doi: 10.1111/j.1469-7793.1998.287bz.x

Table 1.

Twitch and surface action potential parameters before and after 7-day ‘dry’ water immersion

Twitch SAP, first phase


Pt (N) TPT (ms) ½RT (ms) dPt/dt (%Pt ms−1) Pt:Po Amplitude (mV) Duration (ms) Area (mV ms)
Control 125.6 ± 13.7 118.2 ± 3.6 93.7 ± 3.3 2.06 ± 0.29 0.23 ± 0.02 4.6 ± 0.6 10.4 ± 1.0 21.6 ± 3.6
Immersion 139.3 ± 18.6 118.8 ± 3.4 88.7 ± 3.8 * 1.77 ± 0.19 * 0.21 ± 0.02 3.5 ± 0.5 * 12.8 ± 0.7 ** 10.2 ± 2.0 **

Values are means ± s.e.m. Pt, twitch contraction; TPT, time to peak twitch; ½RT, time to half-relaxation; dPt/dt, rate of force development; SAP, surface action potential

*

P < 0.05

**

P < 0.01, control compared with after immersion.