Skip to main content
. 2008 Mar-Apr;43(2):133–143. doi: 10.4085/1062-6050-43.2.133

Figure 3. Preparatory phase (PR) was defined as the 50-ms time period before vertical ground reaction force rises above 5 N. The loading phase (LO) was defined as the first 50% of the stance phase during the side-step cutting tasks.

Figure 3