Skip to main content
. 2008 Feb 15;3:8. doi: 10.1186/1748-5908-3-8

Table 2.

QUERI phases of implementation projects/QUERI pipeline

Phase 1: Pilot project to develop/refine an improvement/implementation program and assess basic feasibility:
◆ Small scale study within a single clinic or facility
◆ Used with a substantiated clinical or delivery best practice
◆ Identifies potential issues relative to routine integration of best practice such as acceptability of the recommendation, process barriers, and needed toolkit elements
Phase 2: Small clinical trials to further refine and evaluate an improvement/implementation program
◆ Relatively modest but multi-site evaluation (e.g., 4-6 facilities within one or two VA regions)
◆ Conducted within a formal research and evaluation framework, e.g., an experimental design. Usually is a hybrid design, i.e., a traditional intervention design plus a descriptive formative evaluation [9]
◆ Requires active research team support and involvement, plus modest real-time refinements to maximize the likelihood of success and to study the process for replication requirements
◆ Enables refinement before larger-scale implementation
Phase 3: "Regional roll-out" projects
◆ Test of large-scale adoption program prior to full VA implementation with 10-20 facilities in 3-5 VA regions
◆ Decreased research team support at local sites and greater involvement of stakeholders, both nationally and locally
◆ Should require less need for real-time refinements of the implementation strategy
◆ Preparation for hand-off at national level
Phase 4: "National roll-out" effort
◆ Implementation of a tested, refined strategy throughout the VA
◆ Existing operations or designated leadership entity deliver the program
◆ Research team support as determined per Phase 3 evaluation
◆ Concurrent and ongoing evaluation, per methodology determined/refined in Phase 3