Skip to main content
. 2008 Apr;191(2):171–183. doi: 10.1016/j.jmr.2007.12.012

Fig. 2.

Fig. 2

Plot of estimated MT parameters from noise-free simulated data (60 points) against MT duty cycle (in percentage) using Ramani’s (filled circles), Sled and Pike’s CW (empty squares) and Sled and Pike’s RP (gray diamonds) equations. From top to bottom, left to right: RA [in s−1], RM0B[in s-1], T2A[in s], F [unitless]. The dashed line shows the value of parameter used to synthesize the data (test set).