Skip to main content
. 2005 Sep 27;93(8):884–889. doi: 10.1038/sj.bjc.6602804

Table 3. Feasibility of S-1.

  Arm A (n=50) Arm B (n=51)
Cumulative rate of total administration
days of S-1 on 112-day (95% CI) 69.4% (56.0–82.9%) 54.4% (40.6–68.1%)
     
Total administration days    
 Mean 87.3 days 87.2 days
 Standard deviation 37.3 days 35.7 days
     
Cumulative rate of the relative total
administration dose of S-1 at 100% (95% CI) 54.9% (40.1–69.7%) 34.3% (21.1–47.4%)
     
Relative total administration dose
 Mean 76.1% 75.7%
 Standard deviation 33.2% 31.3%