Skip to main content
. 2008 Jul 18;4(7):e1000103. doi: 10.1371/journal.pcbi.1000103

Figure 7. Estimating Rates of Escape.

Figure 7

(A) Escape variants often only transiently replace the wild-type variant and oscillate thereafter. Sequence measurements are taken at arbitrary time points (squares). (B) When a model is fitted to those data points the initial escape rate is likely to be underestimated.