Skip to main content
. 2008 Jul 18;2:65. doi: 10.1186/1752-0509-2-65

Table 1.

Some possible pathways for the system in Fig. 2 (or Fig. 6)

Serial Number Some possible paths Optimal c-values Average quantity (z) of P
1 R1 R5 R9 R3 c1 = 0.88, c5 = 0.80, c9 = 0.80, c3 = 0.86 51.53
2 R1 R6 R8 R9 R3 c1 = 0.88, c6 = 0.56, c8 = 0.57, c9 = 0.80, c3 = 0.86 12.22
3 R1 R5 R8 R10 R3 c1 = 0.88, c5 = 0.80, c8 = 0.57, c10 = 0.04, c3 = 0.86 24.63
4 R1 R6 R10 R3 c1 = 0.88, c6 = 0.56, c10 = 0.04, c3 = 0.86 19.88
5 R1 R7 R10 R3 c1 = 0.88, c7 = 0.18, c10 = 0.04, c3 = 0.86 29.41