Skip to main content
. Author manuscript; available in PMC: 2009 Jun 1.
Published in final edited form as: J Struct Biol. 2008 Mar 21;162(3):436–450. doi: 10.1016/j.jsb.2008.02.008

Fig. 3.

Fig. 3

Average alignment error for different sizes of missing wedge and noise level added to projections. (a) Using cross-correlation alignment without accounting for the missing wedge. Total mean square error = 3.72. (b) Using the technique introduced in Section 4. Total mean square error = 1.37.