Skip to main content
. Author manuscript; available in PMC: 2008 Nov 1.
Published in final edited form as: Neural Comput. 2008 Nov;20(11):2745–2756. doi: 10.1162/neco.2008.10-07-622

Fig. 2.

Fig. 2

Changes in run and total time and space with JitCon. JitCon requires more run-time for large simulations (A). Changes in setup-time and run-time balance in these 1 s simulations, leading to comparable total times (B). Space saving increases with increased simulation size up to ~4-fold. (C). (NetCon: solid circles; JitCon: open circles)