Figure 7.
In Task 4, the spatial working memory task, ECS resulted in significantly lower scores than Sham (* p=0.0140). In Task 5, the serial probe recognition task, ECS resulted in lower scores than MST or Sham (* p<0.05).
In Task 4, the spatial working memory task, ECS resulted in significantly lower scores than Sham (* p=0.0140). In Task 5, the serial probe recognition task, ECS resulted in lower scores than MST or Sham (* p<0.05).