Skip to main content
. 2008 Nov 21;2:100–104. doi: 10.2174/1874192400802010100

Fig. (1).

Fig. (1)

Force development is dependent on duration of the pre-beat interval; when previous beat-duration increases, so does peak twitch force development (Fdev). In the depicted example, at a frequency of 8 Hz a 40% variation was imposed. Thus, inter-beat duration varied from 100 to 150 ms, with an average of 125 ms (=8 Hz).