Skip to main content
. 2008 May;3(4):113–124.

TABLE 3.

Cancellation of high-priority procedures according to method of booking surgery*

Proportion (95% CI) Odds Ratio (95% CI)
Wait list booking 88.6 (83.3, 93.8) 1.0
Pre-booking 74.3 (67.0, 81.5) 0.35 (0.18–0.68)

CI = confidence interval.

*

Presented as proportions of hospitals and corresponding odds ratios (with 95% CI) in which at least one elective procedure with high priority was cancelled after the final operating theatre schedule was created.

Adjusted for initial queue size at time of consultation, size of elective and urgent queues at registration on wait list, method of scheduling consultation and method of allocating theatre slots.