Table 1. Pointing errors for simulation 1.
Training | Iep | Iep | Iep | Average Iep | ||
SI | SI | SII | SIII | |||
M0 | D | 0.08+0.02 | 0.09+0.02 | 0.02+0.01 | 0.10+0.05 | 0.08±0.04 |
M0 | S | 0.06+0.01 | 0.08+0.03 | 0.14+0.02 | 0.37+0.27 | 0.16±0.17 |
M1 | D | 0.05±0.01 | 0.06±0.02 | 0.02±0.01 | 0.08±0.05 | 0.06±0.03 |
M1 | S | 0.06±0.01 | 0.07±0.03 | 0.14±0.02 | 0.37±0.18 | 0.15±0.15 |
M2 | D | 0.04±0.02 | 0.05±0.03 | 0.02±0.01 | 0.08±0.03 | 0.05±0.03 |
M2 | S | 0.06±0.02 | 0.07±0.04 | 0.14±0.01 | 0.37±0.11 | 0.15±0.13 |
Average M0–2 | D | 0.06±0.02 | 0.07±0.03 | 0.02±0.01 | 0.09±0.04 | |
Average M0–2 | S | 0.06±0.02 | 0.07±0.03 | 0.14±0.02 | 0.37±0.20 |
Average RMSED (D) and RMSES (S) for each mass condition for the session I (SI), II (SII) and III (SIII). Training: Training set. Iep (inter- and extrapolated positions): test set. Average Iep: RMSE values for the test set averaged across SI, SII and SIII. Average M0–2: RMSED and RMSES values for both the training and test set averaged across the different mass conditions (M0, M1, M2) for each session (SI, SII, SIII).