Figure 6.
Distribution of the deviation in average potential between the analytical approximation and the NPB reference. The potentials are computed as described in Fig. 3. Horizontal axis: The average absolute error per structure ⟨∣ϕ−ϕNPB∣⟩i [Eq. 9]. Vertical axis: Number of structures corresponding to the given average error.