Table 4.
95 % confidence limits |
|||||
---|---|---|---|---|---|
Variable | P | R2 | Slope estimate | Lower | Upper |
Seedling height | 0·002 | 0·149 | –0·0029 | –0·0047 | –0·0011 |
Height increment | <0·001 | 0·194 | –0·0059 | –0·0090 | –0·0028 |
Seedling diameter | 0·070 | 0·053 | –0·0009 | –0·0018 | 0·0001 |
Diameter increment | 0·114 | 0·040 | –0·0014 | –0·0032 | 0·0004 |
Stem biomass | 0·034 | 0·072 | –0·0002 | –0·0005 | –0·00002 |
Root biomass | 0·018 | 0·089 | –0·0009 | –0·0017 | –0·0002 |
Total biomass | 0·025 | 0·079 | –0·0002 | –0·0004 | –0·00003 |