Table 1.

BSCB permeability and microstructural measurements on day 1 and day 3 (mean ± standard deviation). P values for the measurements between day 1 and 3 are given in the last row.

Kp-sc (min-1) λ|| (×10-3 mm2/s) λ⊥ (×10-3 mm2/s) FA
Day 1 0.123 ± 0.008 0.788 ± 0.022 0.579 ± 0.016 0.183 ± 0.025

Day 3 0.076 ± 0.006 0.694 ± 0.026 0.604 ± 0.015 0.097 ± 0.021

P 0.002 0.001 0.002 0.006