Skip to main content
. 2009 Jul 10;106(30):12224–12229. doi: 10.1073/pnas.0900406106

Fig. 6.

Fig. 6.

Sample cost t* plotted against f sw both with and without adjustment for increased relative cost of work simulations (see Efficiency Considerations and Numerical Results). The circles identify the run at τ = 2.0. The dashed line is the sample cost of REM with M = 4 replicas.