Skip to main content
. 2007 Jan 31;12(1):14–21. doi: 10.1007/s00776-006-1087-9

Table 5.

CTSI, DASH, SF-36, VAS and their correlation

Correlationa with
Instrument scale (n) CTSI-JSSH-SS (87) CTSI-JSSH-FS DASH-JSSH
CTSI-JSSH-FS (87) 0.58**
DASH-JSSH (79) 0.54** 0.80**
SF-36-PF (77) −0.23 −0.19 −0.34**
SF-36-RP (66) −0.29* −0.50** −0.71**
SF-36-BP (77) −0.66** −0.63** −0.68**
VAS (77) 0.40** 0.23* 0.32**

*P<0.05

**P<0.01

a Spearman’s rank correlation