Efficiencies for 10×10 cm2 field size, relative to the efficiency obtained for the BEAMnrc default case. The uncertainty was calculated in five different ways, i.e., using only the central bin, the bins with the minimum and maximum values, the bins with values greater than 50% of the maximum value, and, finally, considering all bins.