Skip to main content
. Author manuscript; available in PMC: 2010 Jan 4.
Published in final edited form as: Commun Numer Methods Eng. 2009;25(6):751–770. doi: 10.1002/cnm.1167

Figure 13.

Figure 13

Relationship between the cost time of different main modules and CPU number. (a) and (b) denote their absolute time and percentages of total time.