Skip to main content
. Author manuscript; available in PMC: 2011 Feb 1.
Published in final edited form as: J Consult Clin Psychol. 2010 Feb;78(1):89. doi: 10.1037/a0016778

Figure 3.

Figure 3

Viral loads results between baseline and month 6. Data represent estimated means from hierarchical linear models of participants assigned to 12-step treatment (dashed lines; n = 81) or contingency management treatment (solid lines; n = 89) and take into account data collected between baseline and month 6 (end of treatment). The lower bound on the y-axis of 2.3 reflects non-detectable viral loads as data were log-transformed, and values of 2.3 were included for non-detectable viral loads.