Fig. 10.
A photo of (a) the ITrem instrument attached to the rotating arm and (b) close-up view of the instrument tip placed near to the workspace of M2S2.
A photo of (a) the ITrem instrument attached to the rotating arm and (b) close-up view of the instrument tip placed near to the workspace of M2S2.