Skip to main content
. 2010 Mar 12;6(3):e1000711. doi: 10.1371/journal.pcbi.1000711

Figure 3. Wire length economy of individual spiny and basket cell intracortical axon arbors was suboptimal.

Figure 3

Wire length economy (ε) of spiny and basket cell intracortical axon arbors (εAXON = LMST/LAXON, where LAXON is total axon arbor length based on direct distances between boutons) compared with path length optimized star graphs (εSTAR = LMST/LSTAR) and MST with additional vertices from axon bifurcations or nodes (εMSTnodes = LMST/LMSTnodes).