Skip to main content
. 2010 Mar 19;3:19. doi: 10.1186/1756-3305-3-19

Figure 5.

Figure 5

Estimated and observed mosquito MIR from 2002 to 2008. Lines shown are from observations (solid line) and simulations (dashed line) for Model 1 and Model 4. Only MIR between 2004 and 2007 were simulated by model 4, and MIR in 2008 was only simulated by model 1.