Skip to main content
. 2009 Apr;26(4):585–595. doi: 10.1089/neu.2008.0654

FIG. 4.

FIG. 4.

Change in outcome measures resulting from using a linear elastic material model to represent a hyperelastic response. Negative values indicate that the linear elastic model overestimated the outcome measures, while positive values indicate an underestimation of the outcome. Each of the outcome measures was observed separately in the grey and white matter.