Skip to main content
. 2010 Apr 26;14(2):R73. doi: 10.1186/cc8986

Figure 2.

Figure 2

Protocol for Part 2. At RR 20, 40 and 60 equilibration time preceded measurements denoted M, during ordinary ventilation (NONE), Circuit Flushing (Circuit Flush) and complete ASPIDS. Letters a-h correspond to instances described in the text.