Skip to main content
. 2010 Jun 2;12(1):34. doi: 10.1186/1532-429X-12-34

Table 2.

T2 phantoms and T2 measurement results with T2prep and SE sequences

Sequences Phantom 1
(1043.5)
Phantom 2
(1122.4)
Phantom 3
(754.3)
Phantom 4
(859.5)
SE 32.3 43.9 46.5 51.4
T2prep 32.3 43.5 46 51.7
Errors (%) 0 -0.91 -1.0 0.6

T1 values are shown in parenthesis.