Skip to main content
. 2010 Jun 30;5(6):e11369. doi: 10.1371/journal.pone.0011369

Figure 4. Predicted delay in intake rate scenario.

Figure 4

The predicted delay in departure date (in days since April 12, which was the median departure date in the 1970's) from the wintering site in the Netherlands to a changed intake rate, ranging from 1.4 MJ to 2.8 MJ, at the wintering site and the Baltic stopover site.