Skip to main content
. 1998 Jan 22;1(3):105–110. doi: 10.1186/cc113

Table 1.

Personnel time for patient transport

Group Ready time Return to baseline Number of
(min) time (min) transport personnel
Standard 32 ± 20 23 ± 8 3.6 ± 0.5
Specialty bed 26 ± 2 18 ± 5 3.2 ± 0.7
CarePorter 18 ± 15 11 ± 7* 2.1 ± 0.3

*P = 0.0013, P = 0.0001.