Skip to main content
. 2010 Apr 26;6:15–22. doi: 10.2478/v10053-008-0073-5

Figure A2.

Figure A2.

Scatterplot showing the null correlation between composite performances on the MBEA pitch tasks and the time task for all amusic participants (r = -.41).