Table 2.
Hypothetical response time data for illustrating adjustment procedure.
Data Before Adjustment |
Data After Adjustment |
|||||
---|---|---|---|---|---|---|
Counterbalancing | Block 1 | Block 2 | Cost | Block 1 | Block 2 | Cost |
Control then PM | 850 | 825 | −25 | 850 | 841.25 | −8.75 |
Control then PM | 825 | 850 | 25 | 825 | 866.25 | 41.25 |
PM then Control | 850 | 800 | 50 | 850 | 816.25 | 33.75 |
PM then Control | 825 |
810 |
15 | 825 |
826.25 |
−1.25 |
Block Average | 837.5 | 821.25 | 837.5 | 837.5 |
Note: PM = Prospective Memory. Cost = PM Block response time minus Control Block response time.