Skip to main content
. 2010 Jul-Aug;54(4):308–313. doi: 10.4103/0019-5049.68373

Table 1.

Time to achieve neuraxial block landmarks

Landmark Group A N=30
Group B N=30
Group C N=30
Statistical significance*
Mean SD Mean SD Mean SD “F” P
Time taken to achieve T6 block (min) 18.73 2.79 11.80 3.21 16.93 3.43 19.496 <0.001*
Time to 1st epidural top-up (min) 150.67 35.80 161.67 30.10 180.33 29.97 3.280 0.047
Time to 2nd segment regression (min) 123.00 28.08 130.33 33.94 145.33 27.74 2.152 0.129