Skip to main content
. 2010 Aug 4;17(10):1642–1644. doi: 10.1128/CVI.00258-10

TABLE 2.

Performance of the Architect HIV Ag/Ab combination assay according to cutoff S/CO ratios

Parameter Value(s) based on cutoff S/CO ratio
Value of cutoff S/CO ratio 1.0 6.6 8.8
No. of positive initial screening test results (%) 543 (0.350) 216 (0.139) 209 (0.135)
    No. of false-positive results (%) 346 (0.223) 19 (0.012) 13 (0.012)
    No. of indeterminate results (%) 4 (0.003) 4 (0.003) 4 (0.003)
    No. of true HIV-positive results (%) 157 (0.101) 157 (0.101) 156 (0.100)
    No. of previously confirmed HIV-positive results (%) 36 (0.023) 36 (0.023) 36 (0.023)
Specificity (%) 100.00 100.00 99.36
    95% confidence interval (%) 97.02-100.00 97.02-100.00 95.97-99.97
Positive predictive value (%) 99.78 99.99 99.99
    95% confidence interval (%) 99.75-99.80 99.98-99.99 99.99-99.99
    No. of true HIV-positive results (%) 31.21 89.70 92.31
    No. of previously confirmed HIV results (%) 27.22-35.49 84.00-93.62 86.93-95.67