Table 4.
Job | Feasibility study (1994) |
Estimated REC AM (μg m−3) | |||
n | REC AM (μg m−3) | Difference (μg m−3)a | Relative difference (%)b | ||
Continuous miner | 26 | 248.4 | 272.7 | −24.3 | −10 |
Foreman | 6 | 166.3 | 175.9 | −9.6 | −6 |
n, Number of measurements; AM, arithmetic mean of the personal REC measurements.
Difference between the AM of the measured REC exposure levels in the 1994 feasibility study and the estimated REC exposure level.
Relative difference is the difference divided by the AM of the measured REC exposure levels in the 1994 feasibility study.