Skip to main content
. 2003 Jan 27;100(3):1046–1050. doi: 10.1073/pnas.0236945100

Table 2.

Building multiple regression models of variation in annual management cost and benefit-to-cost ratio of field conservation projects

Dependent variable Intercept Independent variables (coefficient, t)
Overall r2
GNP per unit area, $ km−2 y−1 PPP Project area, km2
Cost, $ km−2 y−1 1.61** 0.57, 8.13** −0.70, 2.34* −0.46, −9.12** 0.81**
Ratio of number of threatened bird species per 1/4° grid to cost, $ km−2 y−1 0.35, NS −0.45, 4.74** 3.84, 8.50** 0.22, 2.46** 0.76**

n = 139 throughout. All variables log10-transformed except: †, log10 (ratio of number of threatened bird species per 1/4° grid to cost) + 0.001-transformed. 

*

, P < 0.05; 

**

, P < 0.01; 

**

, P < 0.001; NS, not significant.