Skip to main content
. 2010 Nov 12;9:323. doi: 10.1186/1475-2875-9-323

Figure 5.

Figure 5

Simulated vectorial capacity. Bi-weekly mean vectorial capacity for the observed rainfall simulation in blue, the prediction made two weeks in advance in green, and the prediction made four weeks in advance in pink.